Solar Farm Access Approved for Manhattan-Arsenal Road
The committee granted access approval for a solar farm development on Manhattan-Arsenal Road approximately 1,000 feet east of Cherry Hill Road.
The MCH Solar 1 project, developed by Soltage LLC, received a special use permit from Will County earlier this year. Because Manhattan-Arsenal Road is designated as a county freeway, any new access points require county board approval.
The solar facility will reuse an existing driveway access point and encompasses approximately 69 acres. The project includes solar panels, electrical equipment, access drives, stormwater management facilities, perimeter fencing, and vegetative buffers.
The approval allows the developer to proceed with obtaining final access permits once all other county requirements are met.
Latest News Stories
Trump calls American military operation in Iran a ‘tremendous military success’
U.S. Energy Department finalizes $3.3B loan to Texas utility
Illinois Quick Hits: Chicago breaks ground on $4.7M torture memorial
Crude oil rises, gas prices may follow
Alabama, Louisiana, Arkansas lead country in veteran protection
Trump leaves NATO on old Air Force One, repeats claims he’s Iran’s no. 1 target
Pollster: Biggs set to win Arizona GOP gubernatorial primary
Chicago mayor says head tax would have prevented deficit
Former judge Dugan avoids prison, fined $5K for obstruction
Food-borne illness cases spike as Michigan declares outbreak
Op-Ed: Women deserve protection from the harm of mail-order abortion pills
Minnesota woman pleads guilty to threatening state House speaker