Beecher Graphic.1

Beecher Approves Over $35,000 for Emergency Repairs to Well #5

Spread the love

Article Summary: The Beecher Village Board unanimously approved more than $35,000 in emergency repairs for Well #5 after a recent video inspection revealed significant corrosion, mineral buildup, and a failing check valve. The essential repairs are needed to address a corroding component that risks breaking and to treat deposits inside the well casing.

Beecher Public Works Key Points:

  • Approved $23,920 to Layne Christensen Company for well casing scarification, chlorination, and replacement of a corroded pitless spool.

  • Approved two proposals from Core & Main totaling $11,980.59 for a new check valve and a new 18-year-old master meter.

  • Repairs were deemed necessary after a video survey found a leaking discharge pipe, a corroding spool, and significant sulfate-based deposits and biofilm on the borehole walls.

BEECHER – The Village of Beecher will undertake a series of urgent repairs on a critical piece of its water infrastructure after the Board of Trustees approved three separate proposals totaling $35,900.59 to rehabilitate Well #5. The action came during the board’s June 9 meeting following a report from the Public Works Committee.

The need for the repairs was identified after a downhole video survey revealed several issues, including a buildup of iron and calcium deposits on the inside of the well pipe.

Trustee Erik Gardner presented the first proposal from Layne Christensen Company for $23,920. This work involves “scarification,” a process using a specialized tool to scrape the mineral deposits off the well’s interior walls. The well will then be chlorinated to prevent bacterial growth before being brought back online.

“There’s a buildup of iron and deposit calcium on the inside of the pipe that they want to take a basically a bit and run it down the inside of the pipe to scarify the walls,” Public Works Superintendent Matt Conner explained to the board.

The inspection also discovered that a “pitless spool,” a component welded into place, was suffering from significant corrosion. According to a proposal from Layne Christensen, the corrosion was advanced enough that it could lead to holes developing, potentially causing the “entire column pipe, pump and motor from falling down hole.”

“The corrosion attached to the weld where the weld actually weakens the metal,” Conner said. “So the corrosion actually started eating away at the weld that was done previously when the pipe was originally put in in 2007.”

In addition to the work by Layne Christensen, the board approved two proposals from Core & Main. The first, for $3,430, is to replace a check valve that is no longer functioning correctly. According to the agenda, the faulty valve is allowing water from the distribution system to leak back into the well house and down the shaft.

The second Core & Main proposal, for $8,550.59, will replace the well’s master meter. “The master meter is 18 years old and the public works committee made the recommendation to replace the meter while the well house is down,” Gardner read from the agenda.

All three measures were approved unanimously by Trustees Gardner, Roger Stacey, Brian Diachenko, Todd Kraus, Jessica Smith, and Joe Tieri.

Leave a Comment





Latest News Stories

diamond shaped orange red reflector street sign that reads road

Laraway Road Widening Project in New Lenox and Frankfort Gets Additional $468,000 for Redesign

Article Summary: The Will County Board approved a supplemental agreement worth $468,374 for additional design and engineering work on the major Laraway Road expansion project. The funds are needed for...
solar panels photovoltaics in solar farm

“Federal Policy Uncertainty” Blamed for Delay of Peotone Solar Farm; County Grants Second Extension

Article Summary: The Will County Board has granted a second permit extension for a solar farm in Peotone Township after the developer, Trajectory Energy Partners, cited "ongoing uncertainty regarding federal...
solar panels photovoltaics in solar farm

Will County Grants Extensions to Five Solar Projects Sold to New Developers

Article Summary: The Will County Board approved first-time permit extensions for five commercial solar projects across Monee, Crete, and Joliet townships, all of which were recently sold to larger energy...
WCO 2025-09-27 at 9.04.10 AM

Will County Board Approves Controversial Drug Recovery Retreat in Crete Township

Article Summary: The Will County Board has approved a special use permit for The Second Story Foundation to operate a long-term residential recovery program for men on a 68-acre horse...
washington township graphic.3

Failed Repair Forces Replacement of 25-Year-Old Furnace at Washington Township Center

Article Summary: A failed repair attempt on the 25-year-old furnace at the Washington Township Center, which caused a fire alarm to activate, has prompted the board to authorize a full...
OLYMPUS DIGITAL CAMERA

Beecher Library Board Approves Budgets for Current and Upcoming Fiscal Years

Article Summary: The Beecher Public Library District Board of Trustees formally approved its final budget for the current 2024-2025 fiscal year and, following a public hearing, passed the new budget...
Meeting Briefs

Meeting Summary and Briefs: Beecher School District 200-U for September 10, 2025

The Beecher School District 200-U Board of Education approved its annual budget, appointed a new member, and greenlit a cosmetic upgrade for the high school during its meeting on September...
Meeting Briefs

Meeting Summary and Briefs: Village of Beecher Board of Trustees for September 22, 2025

The Beecher Village Board addressed persistent structural issues at the new Public Safety Facility during its meeting on September 22. After a report confirmed that new roof leaks have appeared...
washington township graphic.1

Washington Township Overhauls Wage Structure, Boosts Bus Driver Pay

Article Summary: The Washington Township Board of Trustees has initiated a comprehensive review of its wage and job structures to align with state law, improve competitiveness for key positions like...
beecher illinois public library graphic.1

Beecher Library Board President Shirley Biery Announces Resignation

Article Summary: Shirley Biery has announced she will resign from her position as President and Trustee of the Beecher Public Library District Board, effective August 31, 2025. Following the announcement...
Screenshot 2025-09-23 at 7.57.19 PM

Beecher Creates New Adjudication Clerk Position to Manage Municipal Court

Article Summary: The Village of Beecher has formally created the position of Adjudication Clerk by amending its municipal code, aiming to streamline the management of its local ordinance violation hearings....
Screenshot 2025-09-23 at 8.04.29 PM

Beecher High School to Get New Look with Approved Window Wrap

Article Summary: Beecher High School is set for an aesthetic upgrade after the Board of Education approved a nearly $12,500 proposal for a decorative and security-enhancing window wrap. After some...
Screenshot 2025-09-23 at 7.55.43 PM

State’s Attorney Donates Tint Meters to Beecher Police to Enhance Traffic Safety

Article Summary: The Beecher Police Department has received 14 new window tint meters through a donation from the Will County State's Attorney's Office. State's Attorney Jim Glasgow personally presented the...
Screenshot 2025-09-23 at 8.04.22 PM

Brad Shrader Appointed to Fill Vacant Beecher School Board Seat

Article Summary: The Beecher School District 200-U Board of Education has a full roster again after appointing resident Brad Shrader to fill a vacant seat at its September 10 meeting....
Screenshot 2025-09-23 at 8.04.16 PM

Beecher School Board Approves FY26 Budget With Projected Surplus, Earmarks Funds for Major Projects

Article Summary: The Beecher School District 200-U Board of Education formally adopted its Fiscal Year 2026 budget, projecting a modest surplus of approximately $96,000 and continuing a recent trend of...