Screenshot 2025-10-17 at 2.36.18 PM

Beecher School Board Approves Over $42,000 to Remediate Elementary School Tunnels

Spread the love

Beecher Board of Education Regular Board Meeting | October 8, 2025

Article Summary: The Beecher Board of Education has approved a $42,645 contract with Allied Services to address long-standing moisture issues in the crawl space tunnels beneath Beecher Elementary School. The project aims to improve air quality and protect the building’s infrastructure by installing a comprehensive encapsulation system, a new sump pump, and multiple dehumidifiers.

Elementary School Tunnel Remediation Key Points:

  • Action: The board approved a contract with Allied Services for $42,645.63 to remediate moisture issues in the elementary school tunnels.

  • Scope: The project includes installing a vapor barrier encapsulation system on the floor and walls, a new sump pump for water removal, and dehumidifiers in the north tunnels.

  • Problem: The tunnels, which have gravel floors in some sections, have been a source of moisture, leading to concerns about air quality and the building’s structural integrity.

  • Process: The board reviewed three proposals, with Allied Services being the lowest bidder for the comprehensive scope of work required.

The Beecher Board of Education on Tuesday, October 8, 2025, unanimously approved a proposal from Allied Services for $42,645.63 to remediate moisture issues within the crawl space tunnels at Beecher Elementary School.

The decision follows an investigation into the condition of the tunnels, which in some areas have gravel floors and have been a persistent source of moisture. The remediation project is designed to create a healthier and more stable environment under the school. Superintendent Dr. Jack Gaham explained that the approved proposal was the most comprehensive and lowest-priced of the three bids the district received for a comparable scope of work.

“My recommendation would be Allied because they are the lowest of the three,” Gaham told the board, noting that the other proposals were for $49,000 and $38,700 but did not include the same full scope of services.

The project involves several key components. A new sump pump will be installed in the tunnel system beneath the first and second-grade wings to actively remove water. The core of the remediation is an encapsulation system, which Gaham described as a vapor barrier that will be installed on the ground and run partway up the tunnel walls to prevent moisture from seeping into the space.

“It does a encapsulation system,” Gaham explained. “Allied… is floor and up. Allied goes halfway to 3/4 of the way up.”

The board opted for the most comprehensive version of Allied’s proposal, which also includes the installation of dehumidifiers in the north tunnels. While some parts of the tunnel system were previously addressed with concrete, other sections remain gravel. Gaham recommended including the dehumidifiers to ensure the entire system is addressed.

“I think that last little piece would really [help] because even though it was addressed with concrete, as Brad saw, it does stop and it goes back to gravel,” Gaham said. “Being able to catch anything that would even come through there with a dehumidifier, it’s out of sight, out of mind… it’s a good piece of mind that I would recommend doing.”

The final cost of the project increased slightly from an initial estimate after Allied was provided with official schematics of the tunnels, which showed a larger square footage than originally calculated.

The district sought outside validation for the remediation plan. According to Gaham, representatives from both Servpro, a restoration company, and Ideal, an environmental consulting firm that recently conducted fiberglass testing at the school, reviewed the plan and affirmed it was a sound solution to the problem.

The board’s approval was unanimous, reflecting a consensus to move forward with the necessary infrastructure improvements at the elementary school.

Leave a Comment





Latest News Stories

Screenshot 2025-10-25 at 12.42.59 PM

Will County Committee Grapples with $8.9 Million Budget Gap After Contentious 0% Tax Levy Vote

Will County Board Finance Committee Meeting | October 21, 2025 Article Summary: The Will County Board Finance Committee held a contentious debate over how to close an $8.9 million budget shortfall...
Screenshot 2025-10-25 at 10.49.15 AM

Frankfort Township Board Objects, but County Commission Recommends Bar with Video Gaming

Will County Planning and Zoning Commission Meeting | October 21, 2025 Article Summary: Despite a formal objection from the Frankfort Township Board, the Will County Planning and Zoning Commission recommended...
Screenshot 2025-10-25 at 10.49.23 AM

Senior Shared Housing Facility Recommended for Approval in Crete Township

Will County Planning and Zoning Commission Meeting | October 21, 2025 Article Summary: The Will County Planning and Zoning Commission has recommended approval for a special use permit that would...
Screenshot 2025-10-25 at 10.49.32 AM

Crete Township ‘Tiny Home’ Owner Appeals Permit Denial

Will County Planning and Zoning Commission Meeting | October 21, 2025 Article Summary: A Crete Township property owner has appealed to the Will County Planning and Zoning Commission after being...
Will County Finance Logo

Will County Finance Committee Forwards 1.75% Compromise Property Tax Levy to Full Board

Will County Finance Committee Forwards 1.75% Compromise Property Tax Levy to Full Board Article Summary:The Will County Board’s Finance Committee on Tuesday, November 12, 2025, narrowly approved a series of...

WATCH: Trump calls Pritzker a ‘fat slob,’ Illinois governor blasts president

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – President Donald Trump has revived his criticism of Illinois Gov. J.B. Pritzker over crime, and Pritzker has...
Illinois business group warns of 'backbreaking' progressive income tax

Illinois business group warns of ‘backbreaking’ progressive income tax

By Greg Bishop | The Center SquareThe Center Square (The Center Square) – Manufacturers say legislators at the Illinois State Capitol have done enough damage and a progressive tax would...
Illinois tops U.S. in pumpkin production despite recent decline in value

Illinois tops U.S. in pumpkin production despite recent decline in value

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – Despite a recent decline in production value, Illinois is far and away the leader when it comes...
Congress moves to restore federal union powers, critics warn of higher costs

Congress moves to restore federal union powers, critics warn of higher costs

By Catrina Barker | The Center Square contributorThe Center Square (The Center Square) – The U.S. Congress is set to vote on House Resolution 2550, a bill that would restore...
Illinois quick hits: Chiropractor sentenced for fraud; fatal airport shooting investigation

Illinois quick hits: Chiropractor sentenced for fraud; fatal airport shooting investigation

By Jim Talamonti | The Center SquareThe Center Square Chiropractor sentenced for fraud A Chicago chiropractor has been sentenced to nearly six years in federal prison for billing a private...
Will County P&Z Logo Planning Zoning.2

Committee Grants Lenox Solar Farm Project Six-Month Variance Extension

Will County Planning and Zoning Commission Meeting | November 18, 2025 Article Summary:The Will County Planning and Zoning Commission has approved a 180-day extension for variances tied to a commercial...
Will County Logo Graphic

Speed Limits Lowered in Green Garden and Frankfort Neighborhoods

Will County Board Meeting | November 2025 Article Summary: The Will County Board adopted ordinances to establish new, lower speed limits in specific areas of Green Garden and Frankfort Townships....
Will County Board Graphic.02

Engineering Firm Hired for Gougar Road Bridge Replacement

Will County Board Meeting | November 2025 Article Summary: The Will County Board authorized a $301,000 contract for the design of a new bridge carrying Gougar Road over the Canadian...
Will County Board Graphic.03

Unpermitted Log Cabin and Stage Prompt Rezoning in Beecher

Will County Board Meeting | November 2025 Article Summary: The Will County Board approved a zoning map amendment and variances for a property in Beecher to bring existing unpermitted structures...
Federal court blocks Trump from dismantling four agencies

Federal court blocks Trump from dismantling four agencies

By Dave Mason | The Center SquareThe Center Square (The Center Square) – A federal court has issued a permanent injunction stopping the Trump administration from dismantling four federal agencies...