Screenshot 2025-10-17 at 2.36.18 PM

Beecher School Board Approves Over $42,000 to Remediate Elementary School Tunnels

Spread the love

Beecher Board of Education Regular Board Meeting | October 8, 2025

Article Summary: The Beecher Board of Education has approved a $42,645 contract with Allied Services to address long-standing moisture issues in the crawl space tunnels beneath Beecher Elementary School. The project aims to improve air quality and protect the building’s infrastructure by installing a comprehensive encapsulation system, a new sump pump, and multiple dehumidifiers.

Elementary School Tunnel Remediation Key Points:

  • Action: The board approved a contract with Allied Services for $42,645.63 to remediate moisture issues in the elementary school tunnels.

  • Scope: The project includes installing a vapor barrier encapsulation system on the floor and walls, a new sump pump for water removal, and dehumidifiers in the north tunnels.

  • Problem: The tunnels, which have gravel floors in some sections, have been a source of moisture, leading to concerns about air quality and the building’s structural integrity.

  • Process: The board reviewed three proposals, with Allied Services being the lowest bidder for the comprehensive scope of work required.

The Beecher Board of Education on Tuesday, October 8, 2025, unanimously approved a proposal from Allied Services for $42,645.63 to remediate moisture issues within the crawl space tunnels at Beecher Elementary School.

The decision follows an investigation into the condition of the tunnels, which in some areas have gravel floors and have been a persistent source of moisture. The remediation project is designed to create a healthier and more stable environment under the school. Superintendent Dr. Jack Gaham explained that the approved proposal was the most comprehensive and lowest-priced of the three bids the district received for a comparable scope of work.

“My recommendation would be Allied because they are the lowest of the three,” Gaham told the board, noting that the other proposals were for $49,000 and $38,700 but did not include the same full scope of services.

The project involves several key components. A new sump pump will be installed in the tunnel system beneath the first and second-grade wings to actively remove water. The core of the remediation is an encapsulation system, which Gaham described as a vapor barrier that will be installed on the ground and run partway up the tunnel walls to prevent moisture from seeping into the space.

“It does a encapsulation system,” Gaham explained. “Allied… is floor and up. Allied goes halfway to 3/4 of the way up.”

The board opted for the most comprehensive version of Allied’s proposal, which also includes the installation of dehumidifiers in the north tunnels. While some parts of the tunnel system were previously addressed with concrete, other sections remain gravel. Gaham recommended including the dehumidifiers to ensure the entire system is addressed.

“I think that last little piece would really [help] because even though it was addressed with concrete, as Brad saw, it does stop and it goes back to gravel,” Gaham said. “Being able to catch anything that would even come through there with a dehumidifier, it’s out of sight, out of mind… it’s a good piece of mind that I would recommend doing.”

The final cost of the project increased slightly from an initial estimate after Allied was provided with official schematics of the tunnels, which showed a larger square footage than originally calculated.

The district sought outside validation for the remediation plan. According to Gaham, representatives from both Servpro, a restoration company, and Ideal, an environmental consulting firm that recently conducted fiberglass testing at the school, reviewed the plan and affirmed it was a sound solution to the problem.

The board’s approval was unanimous, reflecting a consensus to move forward with the necessary infrastructure improvements at the elementary school.

Leave a Comment





Latest News Stories

WATCH: IL comptroller candidates focus on transparency, timely reporting

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – Transparency is a key talking point for Illinois comptroller candidates. One Republican and five Democrats have filed...
Democratic senators under fire explain why they supported GOP bill to end shutdown

Democratic senators under fire explain why they supported GOP bill to end shutdown

By Thérèse Boudreaux | The Center SquareThe Center Square (The Center Square) – After breaking from the rest of the Democratic Caucus to help Republicans advance a deal that would...
Giannoulias ramps up campaign for state regulation of auto premiums

Giannoulias ramps up campaign for state regulation of auto premiums

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – Illinois Secretary of State Alexi Giannoulias has expanded his campaign to regulate auto insurance rates. Giannoulias visited...
Illinois quick hits: Illinois U.S. senators split on shutdown vote

Illinois quick hits: Illinois U.S. senators split on shutdown vote

By Jim Talamonti | The Center SquareThe Center Square Illinois U.S. senators split on shutdown vote Illinois U.S. Senators Dick Durbin and Tammy Duckworth differed as the Senate voted to...
End to government shutdown in sight after senators make funding deal

End to government shutdown in sight after senators make funding deal

By Thérèse Boudreaux | The Center SquareThe Center Square (The Center Square) – U.S. senators finally broke the government funding impasse Sunday night, voting 60-40 to advance a bill ending...
Screenshot 2025-11-06 at 3.37.51 PM

Will County Saves Nearly $5.74 Million in Bond Refinancing, Explores Future Borrowing Options

Will County Capital Improvements & IT Committee Meeting | November 4, 2025 Article Summary: The Will County Board’s Capital Improvements & IT Committee learned that the county has successfully saved nearly...
Black and white speed limit 25 sign

Will County Board Advances New Speed Limits in Green Garden and Frankfort Townships

Will County Public Works & Transportation Committee Meeting | November 2025 Article Summary: The Will County Board approved new speed limits for a section of Stuenkel Road in Green Garden...
Will County Logo Graphic

New Lenox Garage Variance Denied After Neighbor Cites ‘Massive’ Scale and Neighborhood Impact

Will County Planning and Zoning Commission Meeting | November 4, 2025 Article Summary: The Will County Planning and Zoning Commission unanimously denied a New Lenox Township homeowner's request for a variance...
Screenshot 2025-11-06 at 4.17.20 PM

State Veto Session Passes Energy Bill Limiting County Zoning, Approves Toll Hike for Mass Transit

Meeting Summary and Briefs: Will County Legislative Committee for November 4, 2025 Article Summary: A state lobbyist reported to Will County that the Illinois General Assembly passed a major energy bill...
Large naval presence in Caribbean ahead of Ford arrival

Large naval presence in Caribbean ahead of Ford arrival

By Sarah Roderick-FitchThe Center Square As the number of suspected narcotic transport boats destroyed by the U.S. military grows, so does the number of naval vessels in the Caribbean. Secretary...
Voting rights group warns CA redistricting push could undermine trust in IL

Voting rights group warns CA redistricting push could undermine trust in IL

By Catrina Barker | The Center Square contributorThe Center Square (THE CENTer Square) – California Gov. Gavin Newsom is urging states like Illinois to redraw congressional maps, but voting rights...
Chicago downtown office space vacancy rate jumps to record high levels

Chicago downtown office space vacancy rate jumps to record high levels

By Glenn Minnis | The Center Square contributorThe Center Square (The Center Square) – With Chicago’s downtown office vacancy rate now at a record-high 28%, Illinois Policy Institute researcher LyLena...
will county board graphic

Commission Approves Peotone-Area Farmhouse Split, Overruling Staff’s “Spot Zoning” Concerns

Will County Planning and Zoning Commission Meeting | November 4, 2025 Article Summary: The Will County Planning and Zoning Commission approved a request to rezone a 1.75-acre portion of a larger...
Screenshot 2025-11-05 at 4.18.19 PM

Will County Finance Committee Hits Impasse on 2025 Tax Levy, Postpones Budget Votes

Will County Finance Committee Meeting | November 2025 Article Summary: The Will County Finance Committee postponed votes on the 2025 tax levy and the 2026 budget after a contentious debate...
Federal court backs union on feds' partisan emails

Federal court backs union on feds’ partisan emails

By Esther WickhamThe Center Square A federal judge ruled Friday that the Trump administration violated employees’ First Amendment rights by allegedly hijacking their email accounts to send automated partisan messages...