Screenshot 2025-05-04 at 2.17.47 PM

County Considers Two Options for Prairie View Landfill Expansion

Spread the love

Prairie View landfill could extend its lifespan by up to 35 additional years under expansion plans presented to the county’s landfill committee on Wednesday.

Consultant Marty Fallon outlined two potential expansion strategies that would either build vertically on the existing footprint or combine vertical growth with a horizontal expansion to the northeast.

“We’ve generated dozens of different iterations of concept designs,” said Fallon, an operations manager with Geologic Associates who has spent 25 years designing and permitting waste management infrastructure. “We’ve come to a consensus to site both a vertical expansion option and a horizontal and vertical expansion option and to run those parallel.”

The existing landfill has approximately nine years of capacity remaining at current filling rates. The vertical-only option would add approximately 24.5 years, while the combined vertical and horizontal expansion would provide about 35 years total.

Both options would increase the landfill’s height by approximately 170 feet from its currently permitted elevation, bringing the peak to 965 feet above sea level. According to calculations presented at the meeting, this would make the landfill approximately 320 feet high from its base.

The horizontal expansion would require relocating a 1.4 million cubic yard soil stockpile currently stored in the northeastern portion of the property. Fallon noted that finding an off-site location for this material would be necessary before proceeding with that option.

“The closer the better because it is a lot of soil. It’s going to be a lot of trucks, a lot of excavation, a lot of loading,” Fallon said when questioned about potential sites for relocating the soil.

To advance both design options, Geologic Associates plans to conduct a site investigation beginning April 21, including nine new boring locations extending the grid established during the original late 1990s site assessment. This investigation will characterize the geology and collect data to ensure designs are “protective of public health, safety and welfare,” according to Fallon.

Committee member Van Dyke expressed concern about the increased height, but Fallon presented visual simulations suggesting the expanded landfill would remain largely obscured from surrounding roadways due to existing tree cover and setbacks.

“This site is really buffered very well from the perimeter roadways. Height shouldn’t really be that big of a deal for the committee,” Fallon said.

The development of a final application will be “a huge undertaking,” according to Fallon, potentially requiring a year to 18 months following completion of the geological investigation. The application will include detailed engineering calculations, geological modeling, operating plans, construction quality assurance plans, closure plans, traffic impact analysis and real estate impact studies.

Engineering aspects of the existing landfill, including the integrity of pipes that collect leachate (water that filters through the waste), have received preliminary review to verify they can support the additional weight of expanded waste storage.

During public comments, concerns were raised about garbage debris along roadways used by trucks traveling to and from the landfill. Committee member Butler noted complaints from the farming community about litter along transportation routes.

“I know we do have a county highway that goes from I-55 to Route 53 and is consistently littered with garbage,” said another community member. “I wish there was a way to figure out how to monitor these trucks or do a better job of covering them.”

The landfill committee’s next meeting is scheduled for May 13, though Fallon indicated that complete testing results might not be available for “a couple of months.”

Leave a Comment





Latest News Stories

Beecher Softball ladycats

Johnson’s Solo Homer, Combined Shutout Lift Beecher Past Wilmington 4-0

The Beecher varsity softball team utilized timely hitting and a stellar combined pitching performance to secure a 4-0 non-conference road victory over Wilmington on Thursday afternoon. Beecher (25-26) broke a...
Beecher Baseball Bobcats

13-Run Second Inning Propels Beecher Past Illinois Lutheran 15-0

A monumental 13-run explosion in the second inning and a combined two-hit shutout on the mound propelled the Beecher varsity baseball team to a dominant 15-0 home conference victory over...
Illinois Quick Hits: State gaming board renew Rockford casino license

Illinois Quick Hits: State gaming board renew Rockford casino license

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – The Illinois Gaming Board has renewed Hard Rock Casino Rockford’s license for four years, retroactive to January...
Arizona GOP pushes to protect Colorado River's limited water

Arizona GOP pushes to protect Colorado River’s limited water

By Zachery SchmidtThe Center Square Arizona Republicans are seeking to protect the Colorado River as its water supply continues to dwindle. State Senate President Warren Petersen, R-Gilbert; state House Speaker...
Republicans challenge Clyde in Georgia's 9th District

Republicans challenge Clyde in Georgia’s 9th District

By Andrew RiceThe Center Square Incumbent Rep. Andrew Clyde, R-Ga., is facing a primary challenger in his bid to hold on to his 9th District post. Sam Couvillon and Joel...
Fort Bragg soldier’s case continues Tuesday in New York

Fort Bragg soldier’s case continues Tuesday in New York

By Alan WootenThe Center Square An enlisted soldier at Fort Bragg was granted $250,000 bond release on Friday and will have his charges of using classified information to win $400,000...
Justice Department drops Federal Reserve probe, kicks to watchdog

Justice Department drops Federal Reserve probe, kicks to watchdog

By Brett RowlandThe Center Square U.S. Attorney for D.C. Jeanine Pirro said Friday she is closing the Justice Department's criminal investigation into Federal Reserve Chair Jerome Powell, days after a...
Pritzker: 'Need for speed' for megaprojects bill with tax breaks

Pritzker: ‘Need for speed’ for megaprojects bill with tax breaks

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – Gov. J.B. Pritzker says there is a need for speed when it comes to the Chicago Bears...
NYC schools probed over claims of antisemitism

NYC schools probed over claims of antisemitism

By Chris WadeThe Center Square The Trump administration is investigating claims that New York City schools violated the civil rights of Jewish students by hosting seminars on Palestinian resistance. The...
Illinois Quick Hits: AFP says tax breaks would be more at Soldier Field

Illinois Quick Hits: AFP says tax breaks would be more at Soldier Field

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – Americans for Prosperity Illinois says megaprojects legislation that cleared the Illinois House could give a proposed development...
Soldier's insider trading case puts prediction markets to the test

Soldier’s insider trading case puts prediction markets to the test

By Brett RowlandThe Center Square An alleged attempt by a U.S. Army Special Forces soldier to profit from classified military intelligence on a prediction market platform has resulted in the...
U.S. will continue blockade 'as long as it takes,' Hegseth says

U.S. will continue blockade ‘as long as it takes,’ Hegseth says

By Andrew RiceThe Center Square The United States will continue it's blockade in the Strait of Hormuz for "as long as it takes," War Secretary Pete Hegseth said on Friday....
Beecher Village Graphic.2

Village Board Approves Zoning Variance for 747 Penfield Street

Village of Beecher Meeting | April 13, 2026 Article Summary: The Village of Beecher approved the drafting of an ordinance granting a zoning variance for a commercial property addition on...
Will County Board Graphic.03

Will County Takes Jurisdiction of Countyline Road in $1.84 Million Agreement with Kankakee County

Will County Board Meeting | April 16, 2026 Article Summary: The Will County Board has approved a jurisdictional transfer that brings a 4.27-mile stretch of Countyline Road entirely under Will...
Will County Board Graphic.01

Green Garden Township’s Wildflower Farm Granted Third Special Use Extension

Will County Board Meeting | April 16, 2026 Article Summary: Bengston Land Management, LLC secured a third extension on its special use permit to host rural events at The Wildflower...