Screenshot 2025-05-04 at 2.17.47 PM

Geological Features Central to Landfill Expansion Plans

Geological characteristics that were formed thousands of years ago make Prairie View an ideal location for landfill operations, according to the geologist leading expansion plans for the facility.

During Wednesday’s landfill committee meeting, Marty Fallon of Geologic Associates provided committee members with a detailed explanation of the site’s geological advantages, highlighting how glacial history created favorable conditions for waste management.

“As recent as 13,000 years ago, right where we’re sitting here today was covered by about 2,000 feet of ice during the last glacial period,” Fallon explained. “That clay is very dense, and the reason it’s so dense is because there was 2,000 feet of ice, and all that weight of that ice compacted that clay.”

This compacted glacial clay creates a natural barrier that helps protect groundwater from potential contamination. Fallon displayed microscopic images showing how the flat, platey particles of clay stack upon one another to inhibit water movement.

According to maps from the Illinois State Geological Survey presented during the meeting, the landfill sits on an area with low potential for aquifer contamination due to these thick clay deposits in what geologists call the Rockdale Moraine.

Beneath the clay, the region rests on Silurian dolomite bedrock, similar to limestone, which Fallon noted is the same foundation supporting Chicago’s skyscrapers.

The upcoming site investigation will extend the testing grid established in the 1990s when the original landfill was developed. Nine new boring locations will be drilled, with samples collected for laboratory analysis.

Engineers will also install devices called piezometers that allow monitoring of groundwater levels and flow. These installations will help verify that geological conditions in the proposed expansion area match expectations based on regional data and previous site investigations.

“We want to verify that the geology that we see in that horizontal expansion area is consistent with regional publications. We want to verify that it’s consistent with the information that was documented at the existing facility,” Fallon said.

The uppermost aquifer at the site is located at the top portion of the bedrock, according to Fallon. The investigation will include monitoring of water movement both horizontally and vertically through the various geological layers.

Drilling is scheduled to begin on April 21 and continue for two to three weeks, followed by aquifer testing and installation of monitoring equipment. Laboratory analysis and data compilation will take several additional months.

“I love geology,” Fallon told the committee, “and that nice compacted clay makes a nice spot for landfilling.”

Events

No events

Leave a Comment





Latest News Stories

WCO P&Z Aug 5.3

Key Stretch of Bell Road on Track for Thanksgiving Reopening, Committee Approves Additional Funds

ARTICLE SUMMARY Construction on Bell Road between 159th and 151st Streets is scheduled to have all lanes open by Thanksgiving, officials announced as the Public Works & Transportation Committee approved a...
WCO LEG 8.5.2

Will County Leglislative Committee Opposes Federal Push for Heavier, Longer Trucks

ARTICLE SUMMARY: The Will County Board's Legislative Committee unanimously passed a resolution opposing any federal legislation that would increase the size and weight limits for commercial trucks on national roadways. Will...
WCO Public Safety.2

Will County Reports Progress in Opioid Fight, Highlights New FDA Labeling Rules

Article Summary: Will County is seeing a reduction in opioid overdose deaths and is expanding access to the reversal drug Narcan, health officials reported. The department also drew attention to...
WCO Cap Imp 8.5.4

In-House Staff Completes Major Renovations at Will County Adult Detention Facility

ARTICLE SUMMARY: Maintenance staff at the Will County Adult Detention Facility recently completed extensive renovations in-house, including a new control center and the full restoration of a 48-cell housing unit, saving...
Land use 8.5.25

Will County Advances Truck Repair Facility Plan on Manhattan Road Despite Resident Objections

Article Summary: A proposal to rezone nearly 14 acres on Manhattan Road for a truck repair facility advanced after receiving a recommendation for approval from the Will County Land Use...
WCO P&Z 8.12.1

PZC Grants Variance for Oversized Garage in Joliet Township, Reversing Staff Recommendation

Article Summary: The Will County Planning and Zoning Commission unanimously approved a variance for a Joliet Township homeowner to build a garage addition that exceeds the county's size limits. The...
WCO P&Z Aug 5.5

Will County Public Works Committee Approves Over $1.1 Million in New Agreements for 80th Avenue Project

ARTICLE SUMMARY: The Will County Public Works & Transportation Committee authorized two agreements totaling over $1.1 million for the ongoing reconstruction and widening of 80th Avenue between 191st and 183rd Streets....
Meeting Briefs

Meeting Summary and Briefs: Will County Board Legislative Committee for August 5, 2025

The Will County Board’s Legislative Committee focused on shaping its advocacy efforts at both the state and federal levels during its August 5 meeting. The primary discussion centered on crafting...
Meeting Briefs

Meeting Summary and Briefs: Will County Board Capital Improvements & IT Committee for August 5, 2025

The future of several key county facilities dominated the Will County Capital Improvements & IT Committee meeting on Tuesday. A major topic of discussion was the ongoing buildout of the...
Meeting Briefs

Meeting Summary and Briefs: Will County Land Use & Development Committee for August 7, 2025

The Will County Land Use & Development Committee tackled two contentious zoning cases during its August 7 meeting, denying a special use permit for a landscaping business in a residential...

Meeting Summary and Briefs: Will County Planning and Zoning Commission for August 5, 2025

The Will County Planning and Zoning Commission backed two controversial projects at its August 5 meeting, unanimously approving a large-scale landscaping business on a residential lot in DuPage Township despite...
Meeting Briefs

Meeting Summary and Briefs: Will County Public Works & Transportation Committee for August 5, 2025

The Will County Public Works & Transportation Committee received a detailed presentation on "Our Way Forward 2050," a new 25-year long-range plan designed to guide the region's transportation infrastructure through...
Meeting-Briefs

Meeting Summary: Peotone School District 207-U for July 21, 2025

District Weighs Budget Cuts vs. More Debt: Peotone schools must create a state-mandated deficit reduction plan to address a recurring ~$2 million operating shortfall. The Board of Education is debating whether...
Beecher Graphic.1

Beecher Officially Adopts 1% Grocery Tax to Avert $202,000 Budget Hit

Article Summary: The Beecher Village Board unanimously passed an ordinance to establish a local 1% grocery tax, a proactive measure to prevent an estimated annual revenue loss of over $200,000...
Beecher Graphic.3

Hunter’s Chase Residents Confront Beecher Board Over Lennar Construction Issues

Article Summary: A group of frustrated residents from Beecher's Hunter's Chase subdivision attended the July 28 Village Board meeting to voice numerous complaints about Lennar's new home construction, citing early...