Screenshot 2025-05-04 at 2.17.47 PM

Geological Features Central to Landfill Expansion Plans

Spread the love

Geological characteristics that were formed thousands of years ago make Prairie View an ideal location for landfill operations, according to the geologist leading expansion plans for the facility.

During Wednesday’s landfill committee meeting, Marty Fallon of Geologic Associates provided committee members with a detailed explanation of the site’s geological advantages, highlighting how glacial history created favorable conditions for waste management.

“As recent as 13,000 years ago, right where we’re sitting here today was covered by about 2,000 feet of ice during the last glacial period,” Fallon explained. “That clay is very dense, and the reason it’s so dense is because there was 2,000 feet of ice, and all that weight of that ice compacted that clay.”

This compacted glacial clay creates a natural barrier that helps protect groundwater from potential contamination. Fallon displayed microscopic images showing how the flat, platey particles of clay stack upon one another to inhibit water movement.

According to maps from the Illinois State Geological Survey presented during the meeting, the landfill sits on an area with low potential for aquifer contamination due to these thick clay deposits in what geologists call the Rockdale Moraine.

Beneath the clay, the region rests on Silurian dolomite bedrock, similar to limestone, which Fallon noted is the same foundation supporting Chicago’s skyscrapers.

The upcoming site investigation will extend the testing grid established in the 1990s when the original landfill was developed. Nine new boring locations will be drilled, with samples collected for laboratory analysis.

Engineers will also install devices called piezometers that allow monitoring of groundwater levels and flow. These installations will help verify that geological conditions in the proposed expansion area match expectations based on regional data and previous site investigations.

“We want to verify that the geology that we see in that horizontal expansion area is consistent with regional publications. We want to verify that it’s consistent with the information that was documented at the existing facility,” Fallon said.

The uppermost aquifer at the site is located at the top portion of the bedrock, according to Fallon. The investigation will include monitoring of water movement both horizontally and vertically through the various geological layers.

Drilling is scheduled to begin on April 21 and continue for two to three weeks, followed by aquifer testing and installation of monitoring equipment. Laboratory analysis and data compilation will take several additional months.

“I love geology,” Fallon told the committee, “and that nice compacted clay makes a nice spot for landfilling.”

Events

No events

Leave a Comment





Latest News Stories

Screenshot 2025-10-10 at 11.20.27 AM

Sheriff’s Office Reports Crime Down 10%, Cites Body Cam Footage as Main Challenge of Safety Act

Will County Public Health & Safety Committee Meeting October 2, 2025 Article Summary: The Will County Sheriff's Office reported a nearly 10% overall drop in crime compared to the same...
Screenshot 2025-10-10 at 11.52.24 AM

Will County Considers Moving Land Use Public Hearings Away from Full Board Meetings

Will County Executive Committee Meeting October 9, 2025 Article Summary: A proposal to move the final public hearing for zoning and land use cases from the full Will County Board...
Meeting Briefs

Meeting Summary and Briefs: Washington Township Board of Trustees for August 4, 2025

The Washington Township Board of Trustees focused on employee compensation and infrastructure needs during its August 4 meeting, approving a comprehensive overhaul of its wage structure and job descriptions. The...
washington township graphic.2

Washington Township Board Backs Special Use Permit for Barn on Corning Road

Article Summary: The Washington Township Board of Trustees will support a resident's request for a Special Use Permit to construct a barn on a 5-acre property on E. Corning Road....
Meeting Briefs

Meeting Summary and Briefs: Beecher Public Library District Board for August 19, 2025

The Beecher Public Library District Board of Trustees addressed major financial milestones and a significant leadership change at its August 19 meeting. The board unanimously approved the final budget for...
Enbridge Energy

Will County to Pay Enbridge $82,000 to Relocate Pipeline Equipment for Exchange Street Improvements

Article Summary: Will County will reimburse Enbridge Energy for costs associated with relocating its pipeline facilities to make way for roadway improvements on Exchange Street in the Monee and Crete...
diamond shaped orange red reflector street sign that reads road

Laraway Road Widening Project in New Lenox and Frankfort Gets Additional $468,000 for Redesign

Article Summary: The Will County Board approved a supplemental agreement worth $468,374 for additional design and engineering work on the major Laraway Road expansion project. The funds are needed for...
solar panels photovoltaics in solar farm

“Federal Policy Uncertainty” Blamed for Delay of Peotone Solar Farm; County Grants Second Extension

Article Summary: The Will County Board has granted a second permit extension for a solar farm in Peotone Township after the developer, Trajectory Energy Partners, cited "ongoing uncertainty regarding federal...
solar panels photovoltaics in solar farm

Will County Grants Extensions to Five Solar Projects Sold to New Developers

Article Summary: The Will County Board approved first-time permit extensions for five commercial solar projects across Monee, Crete, and Joliet townships, all of which were recently sold to larger energy...
WCO 2025-09-27 at 9.04.10 AM

Will County Board Approves Controversial Drug Recovery Retreat in Crete Township

Article Summary: The Will County Board has approved a special use permit for The Second Story Foundation to operate a long-term residential recovery program for men on a 68-acre horse...
washington township graphic.3

Failed Repair Forces Replacement of 25-Year-Old Furnace at Washington Township Center

Article Summary: A failed repair attempt on the 25-year-old furnace at the Washington Township Center, which caused a fire alarm to activate, has prompted the board to authorize a full...
OLYMPUS DIGITAL CAMERA

Beecher Library Board Approves Budgets for Current and Upcoming Fiscal Years

Article Summary: The Beecher Public Library District Board of Trustees formally approved its final budget for the current 2024-2025 fiscal year and, following a public hearing, passed the new budget...
Meeting Briefs

Meeting Summary and Briefs: Beecher School District 200-U for September 10, 2025

The Beecher School District 200-U Board of Education approved its annual budget, appointed a new member, and greenlit a cosmetic upgrade for the high school during its meeting on September...
Meeting Briefs

Meeting Summary and Briefs: Village of Beecher Board of Trustees for September 22, 2025

The Beecher Village Board addressed persistent structural issues at the new Public Safety Facility during its meeting on September 22. After a report confirmed that new roof leaks have appeared...
washington township graphic.1

Washington Township Overhauls Wage Structure, Boosts Bus Driver Pay

Article Summary: The Washington Township Board of Trustees has initiated a comprehensive review of its wage and job structures to align with state law, improve competitiveness for key positions like...