Screenshot 2025-05-04 at 2.17.47 PM

Geological Features Central to Landfill Expansion Plans

Spread the love

Geological characteristics that were formed thousands of years ago make Prairie View an ideal location for landfill operations, according to the geologist leading expansion plans for the facility.

During Wednesday’s landfill committee meeting, Marty Fallon of Geologic Associates provided committee members with a detailed explanation of the site’s geological advantages, highlighting how glacial history created favorable conditions for waste management.

“As recent as 13,000 years ago, right where we’re sitting here today was covered by about 2,000 feet of ice during the last glacial period,” Fallon explained. “That clay is very dense, and the reason it’s so dense is because there was 2,000 feet of ice, and all that weight of that ice compacted that clay.”

This compacted glacial clay creates a natural barrier that helps protect groundwater from potential contamination. Fallon displayed microscopic images showing how the flat, platey particles of clay stack upon one another to inhibit water movement.

According to maps from the Illinois State Geological Survey presented during the meeting, the landfill sits on an area with low potential for aquifer contamination due to these thick clay deposits in what geologists call the Rockdale Moraine.

Beneath the clay, the region rests on Silurian dolomite bedrock, similar to limestone, which Fallon noted is the same foundation supporting Chicago’s skyscrapers.

The upcoming site investigation will extend the testing grid established in the 1990s when the original landfill was developed. Nine new boring locations will be drilled, with samples collected for laboratory analysis.

Engineers will also install devices called piezometers that allow monitoring of groundwater levels and flow. These installations will help verify that geological conditions in the proposed expansion area match expectations based on regional data and previous site investigations.

“We want to verify that the geology that we see in that horizontal expansion area is consistent with regional publications. We want to verify that it’s consistent with the information that was documented at the existing facility,” Fallon said.

The uppermost aquifer at the site is located at the top portion of the bedrock, according to Fallon. The investigation will include monitoring of water movement both horizontally and vertically through the various geological layers.

Drilling is scheduled to begin on April 21 and continue for two to three weeks, followed by aquifer testing and installation of monitoring equipment. Laboratory analysis and data compilation will take several additional months.

“I love geology,” Fallon told the committee, “and that nice compacted clay makes a nice spot for landfilling.”

Events

No events

Leave a Comment





Latest News Stories

WCO Finance Aug 5.2

Improved Vendor Service Creates $1.2 Million Shortfall in Sheriff’s Medical Budget

ARTICLE SUMMARY: The Will County Sheriff’s Office is facing a more than $1.2 million shortfall in its budget for inmate medical services, a problem officials attribute to an ironic cause:...
WCO P&Z Aug 5.1

Will County Public Works Committee Unveils 25-Year Transportation Plan, Projects $258 Million Gap

ARTICLE SUMMARY: Will County officials have presented "Our Way Forward 2050," a new long-range transportation plan that provides a 25-year vision for infrastructure projects while forecasting a $258 million shortfall in...
WCO Public Safety.4

Will County Animal Protection Services Seeks New Facility Amid “Gaping Wound” of Space Crisis

Article Summary: Will County Animal Protection Services is seeking approval for a new facility, telling a county committee that its current building is critically inadequate for housing animals, leading to...
WCO Cap Imp 8.5.2

Board Confronts Animal Services Crowding, Explores Future Facility Options

ARTICLE SUMMARY: Will County officials are grappling with an ongoing animal housing crisis that has overwhelmed the county’s Animal Protective Services facility, prompting discussions about expansion, new construction, or even repurposing...
WCO Finance Aug 5.3

Will County Board Members Demand Transparency in Cannabis Tax Fund Allocation

ARTICLE SUMMARY: A debate over transparency and process erupted at the Will County Board’s Finance Committee meeting regarding the distribution of local cannabis tax revenue. Board members called for more...
WCO P&Z Aug 5.2

Homer Glenn Residents Push Back on 143rd Street Widening as Officials Signal “Tentative Agreement”

ARTICLE SUMMARY: A Homer Glenn farm owner voiced strong opposition to the planned widening of 143rd Street during a county meeting, while committee members indicated a "tentative agreement" is in the...
WCO LEG 8.5.1

Will County Forges 2026 Federal Agenda Amid D.C. Policy Shifts, ‘Big Beautiful Bill’ Impacts

ARTICLE SUMMARY: The Will County Board's Legislative Committee is reshaping its federal priorities for 2026, adding new language on environmental justice and LGBTQIA+ rights while creating a more transparent process for...
WCO Public Safety.3

Health Department Seeks $1 Million Levy Increase to Prevent “Weakened System”

Article Summary: The Will County Health Department is asking for a $1 million increase to its property tax levy to save 11 critical jobs that are at risk as post-pandemic...
WCO Cap Imp 8.5.3

County Rolls Out New “OneMeeting” Software to Improve Public Access

ARTICLE SUMMARY: Will County has officially launched a new agenda and meeting management software called "OneMeeting," aimed at improving transparency and making it easier for the public and officials to access...
Meeting Briefs

Meeting Summary and Briefs: Will County Board Finance Committee for August 5, 2025

The Will County Board’s Finance Committee confronted major budget challenges during its Tuesday meeting, led by a stark presentation from the Will County Health Department. Health officials are requesting an...
WCO P&Z 8.12.2

Will County PZC Approves Rezoning for Truck Repair Facility on Manhattan Road Amid Resident Concerns

Article Summary: The Will County Planning and Zoning Commission voted 4-2 to rezone nearly 14 acres in Joliet Township for a truck repair facility. The approval came after a neighboring...
WCO P&Z Aug 5.3

Key Stretch of Bell Road on Track for Thanksgiving Reopening, Committee Approves Additional Funds

ARTICLE SUMMARY Construction on Bell Road between 159th and 151st Streets is scheduled to have all lanes open by Thanksgiving, officials announced as the Public Works & Transportation Committee approved a...
WCO LEG 8.5.2

Will County Leglislative Committee Opposes Federal Push for Heavier, Longer Trucks

ARTICLE SUMMARY: The Will County Board's Legislative Committee unanimously passed a resolution opposing any federal legislation that would increase the size and weight limits for commercial trucks on national roadways. Will...
WCO Public Safety.2

Will County Reports Progress in Opioid Fight, Highlights New FDA Labeling Rules

Article Summary: Will County is seeing a reduction in opioid overdose deaths and is expanding access to the reversal drug Narcan, health officials reported. The department also drew attention to...
WCO Cap Imp 8.5.4

In-House Staff Completes Major Renovations at Will County Adult Detention Facility

ARTICLE SUMMARY: Maintenance staff at the Will County Adult Detention Facility recently completed extensive renovations in-house, including a new control center and the full restoration of a 48-cell housing unit, saving...