Beecher Graphic.1

Beecher Approves Over $35,000 for Emergency Repairs to Well #5

Article Summary: The Beecher Village Board unanimously approved more than $35,000 in emergency repairs for Well #5 after a recent video inspection revealed significant corrosion, mineral buildup, and a failing check valve. The essential repairs are needed to address a corroding component that risks breaking and to treat deposits inside the well casing.

Beecher Public Works Key Points:

  • Approved $23,920 to Layne Christensen Company for well casing scarification, chlorination, and replacement of a corroded pitless spool.

  • Approved two proposals from Core & Main totaling $11,980.59 for a new check valve and a new 18-year-old master meter.

  • Repairs were deemed necessary after a video survey found a leaking discharge pipe, a corroding spool, and significant sulfate-based deposits and biofilm on the borehole walls.

BEECHER – The Village of Beecher will undertake a series of urgent repairs on a critical piece of its water infrastructure after the Board of Trustees approved three separate proposals totaling $35,900.59 to rehabilitate Well #5. The action came during the board’s June 9 meeting following a report from the Public Works Committee.

The need for the repairs was identified after a downhole video survey revealed several issues, including a buildup of iron and calcium deposits on the inside of the well pipe.

Trustee Erik Gardner presented the first proposal from Layne Christensen Company for $23,920. This work involves “scarification,” a process using a specialized tool to scrape the mineral deposits off the well’s interior walls. The well will then be chlorinated to prevent bacterial growth before being brought back online.

“There’s a buildup of iron and deposit calcium on the inside of the pipe that they want to take a basically a bit and run it down the inside of the pipe to scarify the walls,” Public Works Superintendent Matt Conner explained to the board.

The inspection also discovered that a “pitless spool,” a component welded into place, was suffering from significant corrosion. According to a proposal from Layne Christensen, the corrosion was advanced enough that it could lead to holes developing, potentially causing the “entire column pipe, pump and motor from falling down hole.”

“The corrosion attached to the weld where the weld actually weakens the metal,” Conner said. “So the corrosion actually started eating away at the weld that was done previously when the pipe was originally put in in 2007.”

In addition to the work by Layne Christensen, the board approved two proposals from Core & Main. The first, for $3,430, is to replace a check valve that is no longer functioning correctly. According to the agenda, the faulty valve is allowing water from the distribution system to leak back into the well house and down the shaft.

The second Core & Main proposal, for $8,550.59, will replace the well’s master meter. “The master meter is 18 years old and the public works committee made the recommendation to replace the meter while the well house is down,” Gardner read from the agenda.

All three measures were approved unanimously by Trustees Gardner, Roger Stacey, Brian Diachenko, Todd Kraus, Jessica Smith, and Joe Tieri.

Events

No events

Leave a Comment





Latest News Stories

Trump defunds California sex ed program over 'gender ideology'

Trump defunds California sex ed program over ‘gender ideology’

By Andrew RiceThe Center Square The Trump administration terminated a federal grant that provided funding for sex education classes in California. The federal government terminated the Personal Responsibility Education Program,...
WATCH: Illinois In Focus Daily | Thursday Aug. 21st, 2025

WATCH: Illinois In Focus Daily | Thursday Aug. 21st, 2025

By Greg Bishop | The Center SquareThe Center Square (The Center Square) – In today's edition of Illinois in Focus Daily, The Center Square Editor Greg Bishop shares comments from...
Planning & Zoning Graphic.3

Will County P&Z: Washington Township Lot Variance Granted

A variance to reduce the minimum lot area from 10 acres to 5 acres was unanimously approved for a property at 1444 E. Corning Road in Washington Township. The owner,...
solar panels photovoltaics in solar farm

Will County P&Z Approves Crete Solar Farm, Overruling Township’s General Opposition

Article Summary: The Will County Planning and Zoning Commission recommended approval for a new commercial solar farm in Crete Township, moving the project forward despite being informed by staff of...
P&Z 8.19.25

Will County Board Approves Controversial Recovery Retreat in Crete Township Amid Strong Resident Opposition

Article Summary: The Will County Planning and Zoning Commission approved a special use permit for a long-term residential recovery program on a 68-acre horse farm, despite vocal opposition from Crete...

Will County P&Z: Green Garden Township Variances Granted in Monee

Roy F. Erikson received unanimous approval for two variances for his property at 26409 S. 80th Avenue in Monee. The Will County Planning and Zonning Commission approved reducing the minimum...

Will County P&Z: Manhattan Township Rezoning Approved

The Will County Planning and Zonning Commission unanimously approved a map amendment for a vacant property on South Kankakee Street in Manhattan Township. The request, brought by James and Julie...
Planning & Zoning Graphic.4

Will County P&Z: Green Garden Township Rezoning Approved Amid Concerns Over Lack of a Final Plan

Article Summary: The Will County Planning and Zoning Commission unanimously approved rezoning a large agricultural parcel in Green Garden Township for potential residential development, despite a township official expressing concern...
Two orange map markers on city map

Zoning Commission Overrules Staff, Approves Greeen Garden Twp Variance for 3-Acre Agricultural Lot

Article Summary: The Will County Planning and Zoning Commission approved a variance for a 3-acre lot in an agricultural zone, going against a staff recommendation to deny the request in...
Texas House passes Congressional redistricting bill after absconding Dems return

Texas House passes Congressional redistricting bill after absconding Dems return

By Bethany BlankleyThe Center Square After House Democrats absconded for more than two weeks in opposition to a Congressional redistricting bill, the Texas House on Wednesday passed the bill by...

Department of Education ends support for political activism

By Esther WickhamThe Center Square The U.S. Department of Education announced this week it is ending taxpayer-funded programs that supported political activism jobs on college campuses. The Department of Education...
Illinois trucker warns foreign firms faking logs, dodging rules, risking safety

Illinois trucker warns foreign firms faking logs, dodging rules, risking safety

By Catrina Barker | The Center Square contributorThe Center Square (The Center Square) – After a recent deadly crash in Florida and a crash in Illinois involving semi-trucks, an Illinois...
Illinois law mandates pharmacies to sell needles, sparking safety debate

Illinois law mandates pharmacies to sell needles, sparking safety debate

By Catrina Barker | The Center Square contributorThe Center Square (The Center Square) – The Illinois Governor has signed House Bill 2589, which requires pharmacists to sell sterile hypodermic needles...
Report warns U.S. national debt predicted to pass $53 trillion by 2035

Report warns U.S. national debt predicted to pass $53 trillion by 2035

By Thérèse BoudreauxThe Center Square By fiscal year 2035, the national debt is set to surpass $53 trillion, or 120% of the nation’s Gross Domestic Product, according to a new...
Courts remain firm against unsealing grand jury records from Epstein trial

Courts remain firm against unsealing grand jury records from Epstein trial

By Thérèse BoudreauxThe Center Square A second federal judge has denied the Trump administration’s request to unseal grand jury material from convicted sex offender Jeffrey Epstein’s 2019 trial. New York-based...