Screenshot 2025-10-17 at 2.36.18 PM

Beecher School Board Approves Over $42,000 to Remediate Elementary School Tunnels

Spread the love

Beecher Board of Education Regular Board Meeting | October 8, 2025

Article Summary: The Beecher Board of Education has approved a $42,645 contract with Allied Services to address long-standing moisture issues in the crawl space tunnels beneath Beecher Elementary School. The project aims to improve air quality and protect the building’s infrastructure by installing a comprehensive encapsulation system, a new sump pump, and multiple dehumidifiers.

Elementary School Tunnel Remediation Key Points:

  • Action: The board approved a contract with Allied Services for $42,645.63 to remediate moisture issues in the elementary school tunnels.

  • Scope: The project includes installing a vapor barrier encapsulation system on the floor and walls, a new sump pump for water removal, and dehumidifiers in the north tunnels.

  • Problem: The tunnels, which have gravel floors in some sections, have been a source of moisture, leading to concerns about air quality and the building’s structural integrity.

  • Process: The board reviewed three proposals, with Allied Services being the lowest bidder for the comprehensive scope of work required.

The Beecher Board of Education on Tuesday, October 8, 2025, unanimously approved a proposal from Allied Services for $42,645.63 to remediate moisture issues within the crawl space tunnels at Beecher Elementary School.

The decision follows an investigation into the condition of the tunnels, which in some areas have gravel floors and have been a persistent source of moisture. The remediation project is designed to create a healthier and more stable environment under the school. Superintendent Dr. Jack Gaham explained that the approved proposal was the most comprehensive and lowest-priced of the three bids the district received for a comparable scope of work.

“My recommendation would be Allied because they are the lowest of the three,” Gaham told the board, noting that the other proposals were for $49,000 and $38,700 but did not include the same full scope of services.

The project involves several key components. A new sump pump will be installed in the tunnel system beneath the first and second-grade wings to actively remove water. The core of the remediation is an encapsulation system, which Gaham described as a vapor barrier that will be installed on the ground and run partway up the tunnel walls to prevent moisture from seeping into the space.

“It does a encapsulation system,” Gaham explained. “Allied… is floor and up. Allied goes halfway to 3/4 of the way up.”

The board opted for the most comprehensive version of Allied’s proposal, which also includes the installation of dehumidifiers in the north tunnels. While some parts of the tunnel system were previously addressed with concrete, other sections remain gravel. Gaham recommended including the dehumidifiers to ensure the entire system is addressed.

“I think that last little piece would really [help] because even though it was addressed with concrete, as Brad saw, it does stop and it goes back to gravel,” Gaham said. “Being able to catch anything that would even come through there with a dehumidifier, it’s out of sight, out of mind… it’s a good piece of mind that I would recommend doing.”

The final cost of the project increased slightly from an initial estimate after Allied was provided with official schematics of the tunnels, which showed a larger square footage than originally calculated.

The district sought outside validation for the remediation plan. According to Gaham, representatives from both Servpro, a restoration company, and Ideal, an environmental consulting firm that recently conducted fiberglass testing at the school, reviewed the plan and affirmed it was a sound solution to the problem.

The board’s approval was unanimous, reflecting a consensus to move forward with the necessary infrastructure improvements at the elementary school.

Leave a Comment





Latest News Stories

Meeting Briefs

Meeting Briefs: Will County Planning and Zoning Commission for July 15, 2025

Frankfort Shed Relocation Approved: A homeowner on West Harvest Drive in Frankfort Township received a variance to reduce an east side-yard setback from 10 to 4 feet. The variance, sought by...
Beecher Graphic.1

Beecher Overhauls Village Governance, Dissolves Key Commissions in Code Update

Article Summary: The Village of Beecher has fundamentally restructured its governmental framework, approving a pair of ordinances that redefine the roles of trustees, resize the Police Commission, and formally dissolve...
Beecher Graphic.3

Beecher to Explore New Banking Relationship, Considers Annual Bids for Services

Article Summary: The Village of Beecher is poised to change where it banks and how it manages its financial partnerships, following a discussion at the July 14 board meeting. After...
Beecher Graphic.4

Beecher Nuisance Property Owner Makes ‘Substantial Effort’ to Clean Up

Article Summary: The owner of a long-problematic property on Catalpa Street has cleaned up the yard and ordered a dumpster, showing significant progress after years of complaints and recent threats...

Meeting Summary and Briefs: Village of Beecher Board of Trustees for July 14, 2025

The Beecher Village Board passed a major overhaul of its governmental structure at its meeting on July 14, approving ordinances that dissolve the Planning and Zoning and Beautification Commissions and...
WCO Exec Cmte July 10.1

County Approves School Resource Officer, Multi-Year Planning Requirements

Will County approved hiring an additional sheriff's deputy for a school resource officer position that will be fully funded by Summit Hill School District 161, while also passing new transparency...
WCO Exec Cmte July 10.2

County Addresses Senior Tax Exemption Processing Error

A processing error that cost County Board member Julie Berkowicz $600 in senior tax exemptions has prompted discussions about improving verification systems for property tax breaks. Will County Chief Assessment...
Meeting Briefs

Executive Committee Meeting July 10 Meeting Briefs

Liquor License Expansion: The county approved increasing Class C1 liquor licenses from eight to nine to accommodate Lockport Gas and Food LLC at 14747 W. 159th Street in Homer Glen....
Screenshot 2025-08-22 at 8.12.43 PM

Beecher School Board Begins Overhaul of District Goals, Focusing on Transparency, Inclusivity, and Student Success

Article Summary: The Beecher Board of Education has initiated a comprehensive update of its district-wide goals, beginning a process to replace a strategic plan that has been in place since...
beecher ilinois school board graphic.12

Beecher School Board Finalizes Policy Updates, Approves New Student Handbook

Article Summary: The Beecher Board of Education gave its final approval to a series of policy updates and a revised Student Handbook for the 2025-2026 school year. The unanimous votes...
beecher ilinois school board graphic.5

District Modifies Janitorial Contract, Saving Money by Bringing Junior High In-House

Article Summary: The Beecher Board of Education approved a new janitorial contract with Citywide Janitorial for the 2025-2026 fiscal year that covers only the elementary school, a change that will...
Meeting Briefs

Meeting Summary and Briefs: Beecher Board of Education for July 9, 2025

The Beecher Board of Education began the process of creating a new five-year strategic plan by holding an in-depth discussion to overhaul its district goals at its July 9 meeting....
washington township graphic.1

Washington Township to Reduce Office Hours in Summer Trial

Article Summary: The Washington Township Board of Trustees has approved a plan to reduce public office hours for a trial period this summer, citing less foot traffic and potential cost...
washington township graphic.2

Washington Township Opts for $1,050 AC Repair Over $10,200 Replacement

Article Summary: The Washington Township Board of Trustees chose to repair two non-functional, 25-year-old air conditioning units for $1,050 rather than pursue a full replacement of all three units at...
washington township graphic.3

Property Assessments Set to Rise Across Washington Township

Article Summary: Washington Township Assessor Pat Peters has advised residents that property assessments are expected to rise for nearly every property in the township. The increase is due to a...