washington township graphic.2

Washington Township Board Approves Nearly $20,000 for New Digital Sign

Spread the love

Washington Township Board Meeting | September 4, 2024

Article Summary: The Washington Township Board has approved the purchase of a new, high-resolution LED message board for its highway sign at a cost of $19,767.17 from All-Right Sign. The decision followed a review of two quotes, with the board opting for a sign with a lower pixel pitch for sharper image quality.

New LED Sign Key Points:

  • The board unanimously approved the purchase of a 36″ x 72″ LED sign from All-Right Sign for $19,767.17.

  • The chosen sign features a 10mm pixel pitch, which provides sharper images compared to the alternative 16mm option.

  • The decision came after reviewing a competing quote from Fast Signs for $22,100, which did not include the mounting post.

  • The project also involves rebuilding the sign’s brick base, which was necessary to accommodate the new, larger sign.

The Washington Township Board on Wednesday, September 4, 2024, unanimously approved the purchase of a new digital sign for the township, greenlighting a nearly $20,000 expenditure to enhance community communication.

The board voted to accept a $19,767.17 quote from All-Right Sign for a new 36-inch by 72-inch LED “Think Sign.” This decision followed a discussion about replacing the old road sign, which has already been demolished in preparation for the new structure.

Supervisor Mike Stanula presented two quotes for the new message board. A quote from Fast Signs proposed a sign with a 15mm pixel pitch for a total cost of $22,100, a price that did not include the mounting post. All-Right Sign provided two options: a sign with a 16mm pixel pitch for $19,101.94, and one with a higher-resolution 10mm pixel pitch for $19,767.17. Both All-Right Sign quotes included the mounting post and installation.

Stanula explained the technical difference, noting, “The lower the pixel pitch, the sharper the images on the sign.”

The project involves more than just the sign itself. Trustee Mark Herlitz questioned the size of the new LED board and the need for new brickwork. Stanula explained that the existing sign base was larger than the new LED sign, and the brickwork would be necessary to fill the gap and create a more visually appealing final structure. He also noted that an initial plan to install a special-order logo block in the brickwork was scrapped in favor of a simple address block to save “several hundred dollars.”

Following the discussion, Trustee Tracy Heldt made a motion, seconded by Trustee Teresa Peterson, to accept the higher-resolution 10mm pixel pitch option from All-Right Sign. The motion passed unanimously by voice vote. The mason working on the sign’s base can now proceed with the rebuild once the sign’s specifications are shared.

Events

No events

Leave a Comment





Latest News Stories

Screenshot 2025-10-10 at 11.20.27 AM

Sheriff’s Office Reports Crime Down 10%, Cites Body Cam Footage as Main Challenge of Safety Act

Will County Public Health & Safety Committee Meeting October 2, 2025 Article Summary: The Will County Sheriff's Office reported a nearly 10% overall drop in crime compared to the same...
Screenshot 2025-10-10 at 11.52.24 AM

Will County Considers Moving Land Use Public Hearings Away from Full Board Meetings

Will County Executive Committee Meeting October 9, 2025 Article Summary: A proposal to move the final public hearing for zoning and land use cases from the full Will County Board...
Meeting Briefs

Meeting Summary and Briefs: Washington Township Board of Trustees for August 4, 2025

The Washington Township Board of Trustees focused on employee compensation and infrastructure needs during its August 4 meeting, approving a comprehensive overhaul of its wage structure and job descriptions. The...
washington township graphic.2

Washington Township Board Backs Special Use Permit for Barn on Corning Road

Article Summary: The Washington Township Board of Trustees will support a resident's request for a Special Use Permit to construct a barn on a 5-acre property on E. Corning Road....
Meeting Briefs

Meeting Summary and Briefs: Beecher Public Library District Board for August 19, 2025

The Beecher Public Library District Board of Trustees addressed major financial milestones and a significant leadership change at its August 19 meeting. The board unanimously approved the final budget for...
Enbridge Energy

Will County to Pay Enbridge $82,000 to Relocate Pipeline Equipment for Exchange Street Improvements

Article Summary: Will County will reimburse Enbridge Energy for costs associated with relocating its pipeline facilities to make way for roadway improvements on Exchange Street in the Monee and Crete...
diamond shaped orange red reflector street sign that reads road

Laraway Road Widening Project in New Lenox and Frankfort Gets Additional $468,000 for Redesign

Article Summary: The Will County Board approved a supplemental agreement worth $468,374 for additional design and engineering work on the major Laraway Road expansion project. The funds are needed for...
solar panels photovoltaics in solar farm

“Federal Policy Uncertainty” Blamed for Delay of Peotone Solar Farm; County Grants Second Extension

Article Summary: The Will County Board has granted a second permit extension for a solar farm in Peotone Township after the developer, Trajectory Energy Partners, cited "ongoing uncertainty regarding federal...
solar panels photovoltaics in solar farm

Will County Grants Extensions to Five Solar Projects Sold to New Developers

Article Summary: The Will County Board approved first-time permit extensions for five commercial solar projects across Monee, Crete, and Joliet townships, all of which were recently sold to larger energy...
WCO 2025-09-27 at 9.04.10 AM

Will County Board Approves Controversial Drug Recovery Retreat in Crete Township

Article Summary: The Will County Board has approved a special use permit for The Second Story Foundation to operate a long-term residential recovery program for men on a 68-acre horse...
washington township graphic.3

Failed Repair Forces Replacement of 25-Year-Old Furnace at Washington Township Center

Article Summary: A failed repair attempt on the 25-year-old furnace at the Washington Township Center, which caused a fire alarm to activate, has prompted the board to authorize a full...
OLYMPUS DIGITAL CAMERA

Beecher Library Board Approves Budgets for Current and Upcoming Fiscal Years

Article Summary: The Beecher Public Library District Board of Trustees formally approved its final budget for the current 2024-2025 fiscal year and, following a public hearing, passed the new budget...
Meeting Briefs

Meeting Summary and Briefs: Beecher School District 200-U for September 10, 2025

The Beecher School District 200-U Board of Education approved its annual budget, appointed a new member, and greenlit a cosmetic upgrade for the high school during its meeting on September...
Meeting Briefs

Meeting Summary and Briefs: Village of Beecher Board of Trustees for September 22, 2025

The Beecher Village Board addressed persistent structural issues at the new Public Safety Facility during its meeting on September 22. After a report confirmed that new roof leaks have appeared...
washington township graphic.1

Washington Township Overhauls Wage Structure, Boosts Bus Driver Pay

Article Summary: The Washington Township Board of Trustees has initiated a comprehensive review of its wage and job structures to align with state law, improve competitiveness for key positions like...