Screenshot 2025-10-25 at 10.48.48 AM

New Lenox Solar Farm Proposal Advances with Conditions, Following Village and Forest Preserve Input

Spread the love

Will County Planning and Zoning Commission Meeting | October 21, 2025

Article Summary: The Will County Planning and Zoning Commission recommended approval for a 62.7-acre commercial solar energy facility in New Lenox Township, contingent on several conditions, including the development of an emergency response plan and adherence to landscaping requests from the Village of New Lenox. The project, proposed by Nexamp Solar LLC, aims to contribute to Illinois’ renewable energy goals under the Climate and Equitable Jobs Act (CEJA).

Spencer Road Solar Farm Key Points:

  • Project Scope: A special use permit was sought for a commercial solar energy facility on a 110-acre property on South Spencer Road, utilizing approximately 62.7 acres for two projects totaling 5.25 MW (AC).

  • Variances Approved: The commission also recommended variances to allow pollinator-friendly ground cover to grow up to 36 inches (from 13 inches) and to reduce the required number of mowings from five to one annually.

  • Local Input: The Village of New Lenox did not object but recommended conditions concerning setbacks, access drive surfacing, fencing, and landscape screening. The Forest Preserve District of Will County also provided recommendations to protect local wildlife.

  • State Law Compliance: The project falls under Illinois Public Law 102-1123, which sets specific parameters and timelines for counties to review commercial solar energy proposals.

JOLIET, IL – The Will County Planning and Zoning Commission on Tuesday, October 21, 2025, recommended approval for a large-scale commercial solar energy facility on approximately 62.7 acres of agricultural land in New Lenox Township. The recommendation, which now goes to the full Will County Board for a final decision, includes a special use permit and two variances aimed at promoting pollinator-friendly habitats on the site.

The project, proposed by developer Nexamp Solar LLC under the names Spencer Road Solar East LLC and Spencer Road Solar West LLC, involves constructing two adjacent solar facilities on a 110-acre property located on South Spencer Road, south of the Village of New Lenox. The combined facilities will feature approximately 12,029 solar panels on single-axis tracker systems, generating a total of 5.25 megawatts (AC).

The proposal is part of the state’s Adjustable Block program under the Climate and Equitable Jobs Act (CEJA), which incentivizes renewable energy projects. According to Illinois law, county review of such projects is subject to a strict timeline, requiring a public hearing within 60 days of a complete application.

In addition to the special use permit, the commission recommended two variances from county code. The first increases the maximum allowed height for ground cover plants from 13 inches to 36 inches. The second reduces the required number of mowings from five times per year to just once. Staff reports indicated these variances are crucial for establishing a “pollinator-friendly solar site” under the Illinois Pollinator-Friendly Solar Site Act. The taller native vegetation and reduced mowing allow deep-rooted pollinator species to propagate, which helps recharge agricultural soils, improve water infiltration, and provide habitat for birds and insects.

The Village of New Lenox, whose corporate boundary is within 400 to 1,300 feet of the property, reviewed the project and did not object. However, the village board recommended five conditions for approval. These include meeting all county setback requirements, installing a concrete or asphalt surface for the access drive within the Spencer Road right-of-way, installing an eight-foot-tall Fixed Knot Farm fence, placing landscape screening along the western fence line, and abiding by all New Lenox Fire Protection District requirements.

The Forest Preserve District of Will County also submitted a letter with recommendations to mitigate environmental impacts. The district suggested installing wildlife-friendly fencing with a six-inch gap at the bottom to allow for animal movement, clearing trees only between November 1st and March 31st to protect wildlife, and using native quality plant species for landscaping.

According to the developer, the site will be remotely monitored 24/7, with employees only visiting occasionally for maintenance. The project is expected to create 20 to 25 local jobs during its estimated six-month construction phase, anticipated to begin in the fall of 2026. The developer has also entered into an Agricultural Impact Mitigation Agreement (AIMA) with the Illinois Department of Agriculture to ensure the preservation of the agricultural land and provide financial assurance for the eventual decommissioning of the facility.

Events

No events

Leave a Comment





Latest News Stories

will county board.3

Will County Finance Committee Meeting Briefs

Budget Transfers Approved: The Finance Committee approved transferring $18,643 within the Supervisor of Assessments budget to move funds from software licensing to computer hardware purchases. Animal Protection Services Funding: Committee...
will county board.2

Public Works Committee Briefs

Major Projects Update: Construction continues on several major projects including the 80th Avenue expressway overpass, Laraway Road widening near Cedar Road, and Bell Road improvements. The Bell Road project at...
will county board

Capital Improvements & IT Committee Briefs

Bed donation program: Will County donated old beds from Sunny Hill Nursing Home to Joliet Junior College and Project Cure after the nursing home received all new beds for residents....
washington township graphic.1

Washington Township Approves $13,260 Security Overhaul, Opts for Local Vendor with 24/7 Service

Article Summary: The Washington Township Board of Trustees unanimously approved a $13,260 contract with TK Audio & Visual to comprehensively upgrade the security system at the Township Center. The final...
washington township graphic.2

Washington Township Board Appoints Teresa Peterson to Fill Vacancy

Article Summary: The Washington Township Board of Trustees is once again at full strength after unanimously appointing resident Teresa Peterson to fill a trustee vacancy. Peterson took the Oath of...
washington township graphic.3

Washington Township Board Passes 2025-2026 Town Budget

Article Summary: The Washington Township Board of Trustees gave its final approval to the fiscal year 2025-2026 Town Budget, passing the ordinance with a unanimous 4-0 vote. The action occurred...
Meeting-Briefs

Meeting Summary and Briefs: Washington Township Board of Trustees for June 2, 2025

The Washington Township Board of Trustees approved a major security upgrade for its township center and appointed a new trustee to fill a board vacancy during a busy meeting on...
Meeting-Briefs

Meeting Summary and Briefs: Beecher Fire Protection District Board of Trustees for April 24, 2025

The Beecher Fire Protection District Board of Trustees approved a major investment in firefighter safety during its April 24 meeting, authorizing over $91,000 for the purchase of new turnout gear...
Beecher Fire Protection District graphic.4

Beecher Public Bodies Renew Joint Fuel Purchasing Agreement to Save Taxpayer Money

Article Summary: The Beecher Fire Protection District has renewed an intergovernmental agreement with four other local public bodies to continue purchasing fuel in bulk, a strategy designed to reduce costs...
Beecher Fire Protection District graphic.2

Beecher Fire District Invests Over $91,000 in New Protective Gear and Helmets

Article Summary: The Beecher Fire Protection District will purchase new turnout gear and helmets for its firefighters after the Board of Trustees unanimously approved two proposals totaling more than $91,000....
beecher illinois public library graphic.1

Beecher Library Board Installs New Trustees, Elects Officers for Two-Year Term

Article Summary: Following the certification of the April 1 election, the Beecher Community Library Board seated three trustees for six-year terms and unanimously re-elected Shirley R. Biery as president. The...
OLYMPUS DIGITAL CAMERA

Beecher Library Board Streamlines Bill Payments Between Meetings

Article Summary: The Beecher Community Library Board approved a new policy to allow for the payment of routine bills that arrive after its monthly meetings, a move designed to improve...
Meeting Briefs

Meeting Summary and Briefs: Beecher Community Library Board for May 20, 2025

The Beecher Community Library Board seated three newly elected trustees and appointed its officers for the next two years at its May 20 meeting. Shirley R. Biery was re-elected as...
Screenshot 2025-06-16 at 3.26.08 PM

Will County Board Rejects Two Solar Farm Projects After Heated Public Opposition

New Lenox area residents cite safety concerns, property values in opposing commercial solar facilities The Will County Board voted decisively against two proposed commercial solar energy facilities during its May...
will county board.3

County Approves $15 Million Water System Takeover for Southeast Joliet Area

700 homes to receive upgraded service as Joliet takes control of failing sanitary district The Will County Board voted 20-1 to support dissolving the Southeast Joliet Sanitary District and transferring...