Will County Board Graphic.02

Engineering Firm Hired for Gougar Road Bridge Replacement

Spread the love

Will County Board Meeting | November 2025

Article Summary: The Will County Board authorized a $301,000 contract for the design of a new bridge carrying Gougar Road over the Canadian National Railroad in New Lenox. The project aims to improve safety and traffic flow at a critical infrastructure point.

Gougar Road Bridge Key Points:

  • Project: Phase II Design Engineering for the Gougar Road Bridge (County Highway 52).

  • Location: Gougar Road over the Canadian National (CN) Railroad tracks in New Lenox Township.

  • Cost: $301,703.00.

  • Contractor: A. Epstein and Sons International, Inc.

  • Scope: The firm will design a new structure and roadway approaches to replace the existing infrastructure.

JOLIET – Will County is moving forward with plans to replace the Gougar Road bridge over the Canadian National Railroad in New Lenox, authorizing a significant engineering contract on Thursday.

The Board approved a supplemental professional services agreement with A. Epstein and Sons International, Inc. valued at $301,703. The firm is tasked with “Phase II” design engineering, which involves creating the final contract plans, easement documents, and right-of-way plats necessary for construction.

The project targets a section of Gougar Road (County Highway 52) that serves as a key artery in District 2. The current structure over the CN tracks has been identified for replacement to meet modern traffic and safety standards.

Funding for the engineering work will come from a combination of sources, potentially including the Illinois Commerce Commission Grade Crossing Protection Fund, County RTA Tax funds, and County Motor Fuel Tax funds.

This design phase is a critical precursor to construction. Once A. Epstein and Sons completes the structural and roadway design, the county will be positioned to bid the project for construction, likely in a future fiscal year.

Leave a Comment





Latest News Stories

Screenshot 2025-10-10 at 11.39.44 AM

Will County Committee Approves Preliminary $161.6M Tax Levy on Split Vote Amid Heated Debate Over Spending

Will County Finance Committee Meeting October 7, 2025 Article Summary: The Will County Finance Committee on Tuesday narrowly approved a preliminary $161.6 million property tax levy for 2025, which projects...
Screenshot 2025-10-10 at 11.36.42 AM

Will County Eyes Major Overhaul to Consolidate Scattered Government Offices

Will County Capital Improvements & IT Committee Meeting October 7, 2025 Article Summary: Will County officials are formally debating a new facilities master plan to address aging buildings and dozens...
Screenshot 2025-10-10 at 11.20.27 AM

Sheriff’s Office Reports Crime Down 10%, Cites Body Cam Footage as Main Challenge of Safety Act

Will County Public Health & Safety Committee Meeting October 2, 2025 Article Summary: The Will County Sheriff's Office reported a nearly 10% overall drop in crime compared to the same...
Screenshot 2025-10-10 at 11.52.24 AM

Will County Considers Moving Land Use Public Hearings Away from Full Board Meetings

Will County Executive Committee Meeting October 9, 2025 Article Summary: A proposal to move the final public hearing for zoning and land use cases from the full Will County Board...
Meeting-Briefs

Meeting Summary and Briefs: Beecher Fire Protection District for August 28, 2025

Beecher Fire Protection District Meeting | August 28, 2025 The Beecher Fire Protection District Board of Trustees took a significant step toward a potential renewable energy project on Thursday, August...
Beecher Fire Protection District graphic.3

Beecher Fire District Pledges $2,000 to Local Emergency Management Agency

Beecher Fire Protection District Meeting | August 28, 2025 Article Summary: The Beecher Fire Protection District Board of Trustees voted to provide $2,000 in financial support to the Beecher Emergency Management...
Beecher Fire Protection District graphic.1

Beecher Fire District to Reduce Contracted Paramedic Staffing

Beecher Fire Protection District Meeting | August 28, 2025 Article Summary: The Beecher Fire Protection District Board of Trustees has approved an amendment to its contract with Metro Paramedic Services, reducing...
Beecher Fire Protection District graphic.4

Beecher Fire District Explores Solar Farm Partnership with Letter of Intent

Beecher Fire Protection District Meeting | August 28, 2025 Article Summary: The Beecher Fire Protection District is exploring a potential partnership for a commercial solar energy facility after its Board of...
Meeting Briefs

Meeting Summary and Briefs: Washington Township Board of Trustees for August 4, 2025

The Washington Township Board of Trustees focused on employee compensation and infrastructure needs during its August 4 meeting, approving a comprehensive overhaul of its wage structure and job descriptions. The...
washington township graphic.2

Washington Township Board Backs Special Use Permit for Barn on Corning Road

Article Summary: The Washington Township Board of Trustees will support a resident's request for a Special Use Permit to construct a barn on a 5-acre property on E. Corning Road....
Meeting Briefs

Meeting Summary and Briefs: Beecher Public Library District Board for August 19, 2025

The Beecher Public Library District Board of Trustees addressed major financial milestones and a significant leadership change at its August 19 meeting. The board unanimously approved the final budget for...
Enbridge Energy

Will County to Pay Enbridge $82,000 to Relocate Pipeline Equipment for Exchange Street Improvements

Article Summary: Will County will reimburse Enbridge Energy for costs associated with relocating its pipeline facilities to make way for roadway improvements on Exchange Street in the Monee and Crete...
diamond shaped orange red reflector street sign that reads road

Laraway Road Widening Project in New Lenox and Frankfort Gets Additional $468,000 for Redesign

Article Summary: The Will County Board approved a supplemental agreement worth $468,374 for additional design and engineering work on the major Laraway Road expansion project. The funds are needed for...
solar panels photovoltaics in solar farm

“Federal Policy Uncertainty” Blamed for Delay of Peotone Solar Farm; County Grants Second Extension

Article Summary: The Will County Board has granted a second permit extension for a solar farm in Peotone Township after the developer, Trajectory Energy Partners, cited "ongoing uncertainty regarding federal...
solar panels photovoltaics in solar farm

Will County Grants Extensions to Five Solar Projects Sold to New Developers

Article Summary: The Will County Board approved first-time permit extensions for five commercial solar projects across Monee, Crete, and Joliet townships, all of which were recently sold to larger energy...