Joliet Property Owner Cleared to Convert Non-Conforming Building into Two-Unit Residence
Will County Planning and Zoning Commission Meeting | December 16, 2025
Article Summary: The Planning and Zoning Commission legalized the status of a Joliet residence that had previously contained four illegal dwelling units. The board approved variances and a special use permit to allow the owner to remodel the building into a compliant two-unit home.
Will County PZC Key Points:
-
Background: The property was found to have four illegal units after a fire damage repair permit was submitted in 2021.
-
Resolution: The owner agreed to reduce the building to two units—one on the first floor and one on the second.
-
Approvals: The board granted a special use permit for an Accessory Dwelling Unit (ADU) and multiple variances for setbacks and lot area.
-
Outcome: Approved 5-0.
The Will County Planning and Zoning Commission on Tuesday, December 16, 2025, approved a series of requests to bring a non-conforming property in Joliet Township into compliance with county code.
The property, located at 1458 Elgin Avenue, is owned by Jorge Ruiz. According to county staff, the owner submitted a permit to repair fire damage in 2021. During the review, staff discovered the residence contained four dwelling units, though the owner could not prove the multi-family use was ever legally established.
To resolve the violation, the owner agreed to convert the building into two units: a primary residence on the first floor and an Accessory Dwelling Unit (ADU) on the second floor.
The applicant required several variances, including reductions in street and side yard setbacks, as well as a variance for the lot area, which at 6,564 square feet is smaller than the required 10,000 square feet. Additionally, the applicant requested a variance to allow the ADU to be 1,038 square feet, exceeding the 509-square-foot limit calculated based on the primary unit’s size.
Staff recommended denial of the ADU size variance, stating the size was a personal preference. However, the commission recognized the practical difficulty of reducing the second-floor size within an existing structure.
The commission voted 5-0 to approve the special use permit and all five requested variances, allowing the renovation to proceed.
Latest News Stories
Pritzker signs cryptocurrency bills, sparking debate over protection, innovation
Illinois quick hits: Deadly smash and grab reported; resolution honors Charlie Kirk
WATCH: Sides lay out positions on immigration reform amid increased enforcement
Feds, ‘new sheriff’ descend on Chicago suburb, seize illegal vaping items
WATCH: Reaction to Charlie Kirk’s assassination pour in; Freedom Caucus discusses 2026
Illinois quick hits: Freedom Caucus remembers Kirk; new chief judge for Cook County
Illinois quick hits: DOJ seizes illegal vaping products in Bensenville; NFIB optimism index rises
Customs and Border Protection seizes $86.5 million in illegal vapes
WATCH: Pritzker says political violence ‘has got to stop’ in reaction to Kirk shooting
IL Secretary of State candidate talks issues, Giannoulias yet to announce
Illinois quick hits: Universities report increased enrollment; man sentenced for pipe bombs
Bipartisan group of lawmakers aim to increase migrant physician jobs