Beecher Graphic.1

Beecher Board Awards $1.1 Million in Contracts for Miller Street Water Main Replacement

Spread the love

Village of Beecher Board of Trustees Meeting | March 23, 2026

Article Summary: The Village of Beecher has officially greenlit a massive summer infrastructure project, awarding nearly $1.1 million in construction and engineering contracts to replace the Miller Street water main. The project, which will stretch from Dixie Highway to Reed Street, will be heavily subsidized by a $500,000 grant from Will County.

Miller Street Water Main Key Points:

  • M&J Underground was awarded the base bid and option one for the construction project at a total cost of $994,957.74.

  • Baxter & Woodman was awarded a $92,000 contract for construction engineering after the board waived the formal bid process.

  • The Village is utilizing a $500,000 grant from the Will County ARPA Infrastructure Pillar Program to offset costs, with the remainder coming from the Water Main Replacement Fund.

  • Construction will target the 500, 600, and 700 blocks of Miller Street and will take place over the summer while school is out of session.

The Beecher Village Board on Monday, March 23, 2026, unanimously approved the financial framework for one of the village’s largest infrastructure upgrades of the year, formally awarding the contracts necessary to replace the aging Miller Street water main.

Following a competitive bidding process, the board voted 6-0 to award the base construction bid, along with “option one,” to M&J Underground for $994,957.74.

Public Works Committee Chair Erik Gardner outlined the project’s funding, noting that the village’s financial burden has been significantly reduced by outside subsidies. The village previously secured a $500,000 grant through Will County’s American Rescue Plan Act (ARPA) Infrastructure Pillar Program. The remaining balance of nearly $495,000 will be drawn from the village’s dedicated Water Main Replacement Fund.

In a separate but related 6-0 vote, the board agreed to waive the formal bidding process to hire Baxter & Woodman for the project’s construction engineering at a cost of $92,000.

To minimize disruption to the community, the village has scheduled the heavy construction to occur during the summer months.

“Just so that the public knows, the Miller Street water main project is all of Miller Street, the 500, 600, and 700 blocks of Miller from Dixie Highway all the way to Reed Street,” Gardner said. “It’ll be taking place this summer while the school is out of session.”

Leave a Comment





Latest News Stories

Screenshot-2025-08-19-at-6.09.01-PM

Peotone School Board Rejects Mandating Live-Streaming in 4-3 Vote

Article Summary: The Peotone school board has opted against requiring its meetings to be live-streamed, finalizing a new committee policy after a 4-3 vote defeated the mandate. The decision followed...
Illinois GOP U.S. Senate candidates point to economy, Trump gains

Illinois GOP U.S. Senate candidates point to economy, Trump gains

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – Economic issues are front and center for Republican U.S. Senate candidates in Illinois. Former Illinois GOP Chairman...
Meeting-Briefs

Meeting Summary and Briefs: Peotone Board of Education for August 18, 2025

The Peotone Board of Education’s August 18 meeting was defined by the district’s precarious financial situation. With a projected $4.2 million operating deficit and its borrowing capacity nearly exhausted, the...
Lawmaker criticizes $500 student board scholarships amid lowered K‑12 standards

Lawmaker criticizes $500 student board scholarships amid lowered K‑12 standards

By Catrina Barker | The Center Square contributorThe Center Square (The Center Square) – Illinois student leaders serving on state higher education boards will now receive $500-per-semester scholarships under a...
Illinois news in brief: Work begins on $1.5 billion O'Hare expansion; Police catch man accused of road rage, shooting

Illinois news in brief: Work begins on $1.5 billion O’Hare expansion; Police catch man accused of road rage, shooting

By Jim Talamonti | The Center SquareThe Center Square Work begins on $1.5 billion O'Hare expansion A new round of construction has begun at O’Hare International Airport in Chicago. Airline...
Exec Cmte 8.14.25.4

Executive Committee Details Spending of $134 Million in Pandemic Relief Funds

Article Summary: Will County has expended 61% of its $134 million in federal American Rescue Plan Act (ARPA) funds, with significant investments made in infrastructure, health, and economic development. Officials...
Peotone-Committee-8.18.25.1

Facing Budget Crisis, Peotone Committee Questions Athletic Field Project

Committee of the Whole Article Summary: With Peotone School District 207-U on the verge of a financial crisis, board members are questioning the wisdom of moving forward with a long-awaited...
Meeting-Briefs

Committee Summary and Briefs: Peotone Board of Education Committee of the Whole

The Peotone School District 207-U is on a collision course with a major financial crisis, which dominated the Board of Education’s committee meeting on August 18. Facing a projected $4.2...
Soaring utility bills, solar federal tax credit cuts dominate Illinois energy debate

Soaring utility bills, solar federal tax credit cuts dominate Illinois energy debate

By Catrina Barker | The Center Square contributorThe Center Square (The Center Square) – Energy prices and clean energy policy took center stage during a senate energy and public utilities...

Illinois quick hits: Pritzker signs crypto regulations

By Jim Talamonti | The Center SquareThe Center Square Pritzker signs crypto regulations Gov. J.B. Pritzker has signed two laws to regulate cryptocurrency. Senate Bill 1797 requires cryptocurrency companies to...
Trucking industry leader: New law may drive business out of Illinois

Trucking industry leader: New law may drive business out of Illinois

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – A trucking industry leader says more businesses may leave Illinois after the signing of Senate Bill 328....
Exec Cmte 8.14.25.3

Executive Committee Considers $12,000 Strategic Planning Initiative with University of St. Francis

Article Summary: The Will County Executive Committee is considering a proposal from the University of St. Francis to lead a six-month, $12,178 strategic planning process. The initiative is aimed at...
Exec Cmte 8.14.25.2

Executive Committee Members Decry Roadside Litter, Call for Action Against Garbage Haulers

Article Summary: Will County Executive Committee members expressed frustration over what they described as a worsening problem of litter blowing from garbage trucks across the county. Members called for better...
Ad Hoc.8.12.25.3

Will County Updates Solid Waste Ordinance, Increases Fines and Reporting to Landfill Committee

Article Summary: The Will County Ad-Hoc Ordinance Review Committee advanced an updated solid waste ordinance that doubles the maximum fine for violations and requires the county auditor's annual report to...
Ad Hoc.8.12.25.2

Citing Liability Concerns, Will County Committee Postpones Vote on Septic System Ordinance

Article Summary: The Will County Ad-Hoc Ordinance Review Committee postponed a vote on updating its sewer and sewage disposal ordinance after a member raised significant concerns about the county's liability...