—Photo by Glenn P. Knoblock
—Photo by Glenn P. Knoblock

Forest Preserve District Advances Major Extensions and Repairs on Plum Creek Greenway Trail in Crete Township

Spread the love

Article Summary: The Forest Preserve District is currently undertaking dual construction projects on the Plum Creek Greenway Trail, initiating a massive 1.5-mile southern extension through Plum Valley Preserve and commencing repairs on an 80-foot bridge damaged by a fallen tree in Goodenow Grove Nature Preserve.

Plum Creek Greenway Trail Projects Key Points:

  • A new 1.5-mile trail extension will connect Plum Valley Preserve to Goodenow Grove Nature Preserve in Crete Township, with an estimated completion date of fall 2026.

  • The extension features the installation of 800 feet of elevated concrete boardwalks and a 150-foot bridge over Plum Creek, which will become the District’s largest single-span bridge.

  • Repairs began in early March on an 80-foot bridge in Goodenow Grove that was heavily damaged by a fallen tree in January 2025. Contractors are installing new footings, supports, and decking.

  • Future phases of the trail extension aim to connect the path north into Cook County and south to Beecher via the proposed Vincennes Trail.

  • The projects are locally funded by the Forest Preserve District’s Capital Improvement Program and a 2024–2028 grant from the Chicago Metropolitan Agency for Planning.

The Forest Preserve District announced in early March that dual construction projects are currently underway to expand and repair the Plum Creek Greenway Trail, promising significant upgrades for outdoor recreation in Crete Township and the surrounding Will County communities.

The most expansive of the two projects is a new 1.5-mile trail extension that will head south, winding through a hilly section of Plum Valley Preserve. The new multi-use trail will feature a 10-foot-wide path with 3-foot turf shoulders on each side. The extension will consist of a half-mile of crushed limestone, a half-mile of asphalt, and a half-mile street route.

The short street connection will be marked with explicit street signs and pavement directions, leading path users from the newly built trail section to an existing 3.15-mile leg of the Plum Creek Greenway Trail at Goodenow Grove Nature Preserve. The new construction is being added to an existing 1-mile crushed limestone segment that extends south from the Plum Valley Preserve entrance and dog park.

“Upon completion, the project will eliminate a gap in the existing trail system, resulting in a continuous greenway trail connection between Goodenow Grove Nature Preserve and the Plum Valley Preserve – Burville Road access,” said Colleen Novander, the Forest Preserve District’s director of planning and land preservation.

To navigate sensitive ecological areas, contractors are actively installing sections of a precast concrete pedestrian boardwalk to elevate the path. Crews will lay down one 600-foot section and another 200-foot section of boardwalk, utilizing massive concrete components that weigh 4,000 pounds each.

Additionally, concrete abutments are being poured and cured to support a new bridge spanning Plum Creek. Expected to be installed later in April, the 150-foot structure will be the largest single-span bridge in the District.

To minimize environmental impact to existing natural features like wetlands, ravines, and sensitive habitats, the engineering phase dictated that construction remain confined to a designated corridor with a maximum width of 100 feet.

The extension project, which carries an estimated completion date of fall 2026, is funded by the Forest Preserve District’s Capital Improvement Program. Supplemental funding support is provided through the Chicago Metropolitan Agency for Planning’s (CMAP) 2024–2028 Locally Programmed Transportation Alternatives Program (TAP-L).

Looking ahead, District officials noted that future phases of the trail will provide a critical north–south connection, eventually extending the path north into Cook County and south to the Village of Beecher via the proposed Vincennes Trail.

Goodenow Grove Bridge Repairs
While the extension moves forward, a separate set of contractors began repair work in early March on an existing bridge located in the eastern section of Goodenow Grove Nature Preserve, near East Bemes Road.

The 80-foot bridge, which sits just north of the preserve’s well-known “big bridge,” was significantly damaged in January 2025 when a large tree fell on the structure. Following the incident, the District consulted engineers to determine if the bridge required a total replacement or if it could be salvaged. Engineers ultimately concluded that the structure could be repaired.

Originally built in 2011 in tandem with the initial construction of the Plum Creek Greenway Trail and a capital redesign project at Goodenow Grove, the bridge requires extensive rehabilitation. Contractors are currently replacing one of the bridge’s main support structures and pouring new concrete footings. Additionally, all of the bridge’s decking and railings will be entirely replaced.

“It will look like a brand new bridge,” stated Chris Moeller, a Forest Preserve operations department supervisor.

The section of the Plum Creek Greenway Trail affected by the damage has been closed to the public since the tree fell in January. District officials anticipate the repairs will take several weeks to complete, noting that weather and other factors could impact the timeline. The trail segment will officially reopen once the reconstruction is finalized.

—Photo by Glenn P. Knoblock

Leave a Comment





Latest News Stories

Siri class action lawsuit greenlit, billions at stake

Siri class action lawsuit greenlit, billions at stake

By Jonathan Bilyk | Legal NewslineThe Center Square A judge has cleared the way for as many as 3 million Apple device users in Illinois to be included in a...
California attorney general cites success in tackling fraud

California attorney general cites success in tackling fraud

By Dave MasonThe Center Square Editor's note: This story has been updated since its original publication to include a comment from the White House. California has recovered nearly $2.7 billion...
Illinois Quick Hits: Reward offered in Chicago shooting

Illinois Quick Hits: Reward offered in Chicago shooting

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – Cook County Crime Stoppers are offering a reward up to $10,000 for information that leads to the...
'Ridiculous:' Republicans reject Dems' 10 demands for DHS reforms

‘Ridiculous:’ Republicans reject Dems’ 10 demands for DHS reforms

By Thérèse BoudreauxThe Center Square With a partial shutdown looming, U.S. lawmakers have eight days to broker a deal on the Department of Homeland Security’s annual budget. Progress, however, remains...
Legal scholars clash over climate lawsuits against energy companies

Legal scholars clash over climate lawsuits against energy companies

By Nolan MckendryThe Center Square A panel of legal scholars and lawyers argued Thursday over what a growing wave of climate lawsuits really represents: a legitimate use of courts to...
WATCH: Bessent spars with lawmakers over tariffs, Trump lawsuits

WATCH: Bessent spars with lawmakers over tariffs, Trump lawsuits

By Andrew RiceThe Center Square Lawmakers grilled Treasury Secretary Scott Bessent on the Trump administration’s tariff policies and high profile lawsuits in the administration. Bessent, speaking before the Senate Banking,...

WATCH: Senate Dems: ‘We in Illinois need to tax’

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – Illinois Senate Democrats are pushing for higher taxes on digital advertising, billionaires and corporations. At the Illinois...
Poll: Americans say cutting government spending is best way to reduce debt

Poll: Americans say cutting government spending is best way to reduce debt

By Emily RodriguezThe Center Square A majority of Americans say cutting government spending is the best way to lower debt and costs, a new poll from the National Taxpayers Union...
Illinois senator seeks immediate expulsions for student sexual assault

Illinois senator seeks immediate expulsions for student sexual assault

By Catrina Barker | The Center Square contributorThe Center Square (The Center Square) – An Illinois state senator is renewing a push to change state law to require the immediate...
Minnesota protest investigations spark free speech debate

Minnesota protest investigations spark free speech debate

By Elyse ApelThe Center Square As the Trump administration moves forward with investigations around protests in Minneapolis, free speech groups are raising red flags. Aaron Terr, director of public advocacy...
HBO MAX

HBO Max Orders Cop Drama Pilot ‘American Blue’ to Film in Joliet

Article Summary: HBO Max has ordered a pilot for a new police drama titled "American Blue," with production scheduled to begin in Joliet and Chicago this April. Starring Milo Ventimiglia...
Illinois Quick Hits: Ex-sheriff employee ordered to repay $35,000

Illinois Quick Hits: Ex-sheriff employee ordered to repay $35,000

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – A judge has ordered a former Cook County Sheriff’s office employee to pay more than $35,000 in...
Routh sentenced to life in prison for assassination attempt on Trump

Routh sentenced to life in prison for assassination attempt on Trump

By Alan WootenThe Center Square Ryan Routh, the North Carolina native who lived in Hawaii, has been sentenced to life in prison on conviction of going to Florida attempting to...
INVESTIGATION: Wisconsin university closes DEI unit but keeps most staff working on equity issues

INVESTIGATION: Wisconsin university closes DEI unit but keeps most staff working on equity issues

By Jared StrongThe Center Square After concerns were raised about spending on DEI, the University of Wisconsin-Madison shuttered a department but kept most of the staff and their titles working...
Will County Board Graphic.03

Will County Public Works Advances $1.9 Million Improvement for Wilmington-Peotone Road

Public Works & Transportation Committee Meeting | February 3, 2026 Article Summary: The Will County Public Works and Transportation Committee has authorized a nearly $2 million contract for Phase I...