Will County P&Z Logo Planning Zoning

Green Garden Solar Project Cleared to Implement Higher “Agrivoltaic” Standards

Spread the love

Will County Planning and Zoning Commission Meeting | May 5, 2026

Article Summary: The Will County Planning and Zoning Commission approved four variances on Tuesday, May 5, 2026, to facilitate “agrivoltaics” at a proposed solar farm in Green Garden Township, allowing native plants to grow up to three feet tall. The decision permits USS Talamh Solar LLC to deviate from standard weed-control ordinances to meet the rigorous requirements of the Illinois Pollinator-Friendly Solar Site Act.

Pollinator Variance Key Points:

  • Specific Approvals: Variances V-26-115 through V-26-118 were approved in 5-2 votes, allowing ground cover height of 36 inches and reducing required mowings from five to four annually.

  • Environmental Justification: The higher growth is required for native Illinois species to self-pollinate, establish deep root systems for soil recharge, and improve water infiltration.

  • Scorecard Compliance: The developer must complete a “solar site scorecard” with the Illinois Department of Natural Resources (IDNR) to be officially recognized as a pollinator-friendly facility.

  • Wildlife Monitoring: As a condition of approval, the developer must work with the Will County Forest Preserve District to document and monitor wildlife mortality incidents on the 90-acre site.

JOLIET — Beyond the debate over solar panels and battery storage, the Will County Planning and Zoning Commission focused on the future of the soil itself on Tuesday, May 5, 2026, granting a series of variances that will transform a 90-acre farm field into a protected pollinator sanctuary.

The applicant, USS Talamh Solar LLC, successfully argued that standard county maintenance codes—which typically require frequent mowing and height limits for “weeds”—are incompatible with the biological needs of native Illinois prairie plants. To qualify for the state’s community solar program, projects must earn “points” via agrivoltaics, the practice of combining solar energy production with agricultural utility.

Scientific Basis for the Request
Harry Marwil, senior developer for US Solar, explained that the facility intends to plant deep-rooted native species underneath the 17,225 solar panels. ” Agrivoltaics would require pollinator plantings to be grown to 36 inches to establish properly,” Marwil testified.

Ryan Mioni, a civil engineer for the developer, added that these plants act as a natural defense against the very drainage issues neighbors fear. “Native pollinators have deep root systems that recharge agricultural soils, help water infiltration, and provide natural weed prevention,” Mioni said. He noted that the plants need the additional height to propagate effectively and self-pollinate.

The commission’s approval (V-26-115 and V-26-117) raises the allowable height of ground cover from the current 13-inch limit to 36 inches for both parcels involved in the project. Additionally, V-26-116 and V-26-118 reduce the mandatory mowing frequency from five times per year to four.

Forest Preserve and Agency Input
The variances were supported by a land-use analysis that noted the surrounding area already consists of agricultural fields where crops such as corn and soybeans frequently exceed 36 inches.

The Forest Preserve District of Will County provided a formal review of the plan. In a letter dated April 16, 2026, Real Estate Manager Em Wilcher encouraged the developer to utilize the IDNR Solar Site Pollinator Establishment and Management Guidelines. Wilcher requested that the site operator monitor the property for bird, mammal, and insect mortality, providing quality photographs and documented locations to the district.

Opposition and Resident Concerns
The variances were not without detractors. Commissioner Roger Bentonhausen and Commissioner Karen Warick provided the two dissenting votes on all four requests.

During public comment, Green Garden Township Supervisor Dean Christophilos argued that the “natural” look of a pollinator field would be a poor fit for a residential area. “It’s going to change the complexity of our township,” Christophilos said, noting the project’s proximity to a hundred-home subdivision.

Resident Melissa Taviger questioned the honesty of the maintenance plan, suggesting that reduced mowing was a cost-saving measure for the developer rather than an environmental benefit. “There are so many inconsistencies with what they’re proposing,” Taviger told the commission.

Ultimately, the board found that the environmental benefits of soil preservation and stormwater management outweighed the aesthetic concerns of the township. The variances passed 5-2, moving the project forward to the full County Board for final deliberation.

Leave a Comment





Latest News Stories

will county board.3

Speed Limits Reduced on Two Township Roads

The committee approved new speed zones for two township roads based on engineering studies showing current limits exceed safe driving speeds. Offner Road in Green Garden Township will have a...
will county board.2

Will County Finance Committee Approves Juvenile Detention Center Upgrades

Committee votes to keep facility operational, moves forward with compliance modifications Will County Finance Committee members voted unanimously Monday to recommend keeping the River Valley Detention Center operational and making...
will county board.2

Major Grade Separation Projects Advance with Engineering Contracts

The committee approved two significant engineering agreements for major railroad overpass projects totaling over $4 million. TranSystems Corporation received a $4,003,256 contract for construction engineering services on the Lorenzo Road...
County Board Room

County Authorizes Condemnation for Francis Road Project

The committee authorized the State's Attorney's Office to proceed with condemnation cases for right-of-way acquisition needed for Francis Road improvements between Gougar Road and Interstate 80. Eight property parcels are...
will county board

Solar Farm Access Approved for Manhattan-Arsenal Road

The committee granted access approval for a solar farm development on Manhattan-Arsenal Road approximately 1,000 feet east of Cherry Hill Road. The MCH Solar 1 project, developed by Soltage LLC,...
will county board.3

Will County Finance Committee Meeting Briefs

Budget Transfers Approved: The Finance Committee approved transferring $18,643 within the Supervisor of Assessments budget to move funds from software licensing to computer hardware purchases. Animal Protection Services Funding: Committee...
will county board.2

Public Works Committee Briefs

Major Projects Update: Construction continues on several major projects including the 80th Avenue expressway overpass, Laraway Road widening near Cedar Road, and Bell Road improvements. The Bell Road project at...
will county board

Capital Improvements & IT Committee Briefs

Bed donation program: Will County donated old beds from Sunny Hill Nursing Home to Joliet Junior College and Project Cure after the nursing home received all new beds for residents....
washington township graphic.1

Washington Township Approves $13,260 Security Overhaul, Opts for Local Vendor with 24/7 Service

Article Summary: The Washington Township Board of Trustees unanimously approved a $13,260 contract with TK Audio & Visual to comprehensively upgrade the security system at the Township Center. The final...
washington township graphic.2

Washington Township Board Appoints Teresa Peterson to Fill Vacancy

Article Summary: The Washington Township Board of Trustees is once again at full strength after unanimously appointing resident Teresa Peterson to fill a trustee vacancy. Peterson took the Oath of...
washington township graphic.3

Washington Township Board Passes 2025-2026 Town Budget

Article Summary: The Washington Township Board of Trustees gave its final approval to the fiscal year 2025-2026 Town Budget, passing the ordinance with a unanimous 4-0 vote. The action occurred...
Meeting-Briefs

Meeting Summary and Briefs: Washington Township Board of Trustees for June 2, 2025

The Washington Township Board of Trustees approved a major security upgrade for its township center and appointed a new trustee to fill a board vacancy during a busy meeting on...
Meeting-Briefs

Meeting Summary and Briefs: Beecher Fire Protection District Board of Trustees for April 24, 2025

The Beecher Fire Protection District Board of Trustees approved a major investment in firefighter safety during its April 24 meeting, authorizing over $91,000 for the purchase of new turnout gear...
Beecher Fire Protection District graphic.4

Beecher Public Bodies Renew Joint Fuel Purchasing Agreement to Save Taxpayer Money

Article Summary: The Beecher Fire Protection District has renewed an intergovernmental agreement with four other local public bodies to continue purchasing fuel in bulk, a strategy designed to reduce costs...
Beecher Fire Protection District graphic.2

Beecher Fire District Invests Over $91,000 in New Protective Gear and Helmets

Article Summary: The Beecher Fire Protection District will purchase new turnout gear and helmets for its firefighters after the Board of Trustees unanimously approved two proposals totaling more than $91,000....