Beecher Village Graphic.2

Beecher Approves $36,000 Satellite Leak Detection Contract With Asterra

Spread the love

Beecher Village Board Meeting | May 11, 2026

Article Summary: The Beecher Village Board on Monday, May 11, 2026, unanimously approved a $36,000 contract with Asterra to provide satellite-based leak detection services, a new technology the village hopes will identify subsurface water main leaks before they surface and drive up pumping costs.

Asterra Leak Detection Key Points:

  • The board accepted a $36,000 proposal from Asterra for satellite leak detection, well below the $72,000 to $108,000 range trustees had been bracing for.
  • Service includes a five-person crew working on-site for a week to narrow satellite findings to within an 18-foot radius.
  • Public works officials hope the system will identify “catastrophic” subsurface losses currently driving up pump-to-bill ratios.
  • The board indicated the service could become a biennial rather than annual expense if results are strong.

BEECHER — The Beecher Village Board on Monday, May 11, 2026, unanimously approved a $36,000 contract with Asterra to provide satellite-based leak detection services, a tool village officials hope will dramatically reduce unaccounted-for water loss by pinpointing leaks below ground that don’t surface in visible breaks.

Trustee Erik Gardner, who chairs the Public Works Committee, introduced the motion after telling colleagues that the price came in well under expectations. “It’s uh very promising and it was we were kind of figuring that was it could be maybe two to three times more expensive than this,” Gardner said. “So it was it was pretty surprising but um pretty promising.”

The technology differs from traditional surface-leak surveys. According to the public works superintendent, who briefed the board, the Asterra satellite scan is calibrated to detect chlorinated municipal water specifically, distinguishing treated drinking water from naturally occurring sources such as rivers, streams or saltwater. The result is a system tuned to find leaks from the village’s distribution mains rather than chase false positives from surface water.

How the Service Works

Once satellite data is analyzed, Asterra deploys a five-person crew to Beecher for roughly a week. That crew uses the satellite findings to narrow each suspected leak to within an 18-foot radius, the superintendent told the board, giving village staff a tight target area for follow-up excavation. “They’ll have a fiveman crew on site as well for a week and trying to pinpoint within an 18t radius of what the satellite’s telling them,” he said. “So, kind of get us at least in a general direction of where some of the bigger leaks are below grade.”

The superintendent acknowledged the technology is unproven for Beecher’s distribution system. “It’s uh pretty sounded pretty promising,” he said. “Um it’s definitely a a new technology era that we’re, you know, trying to give it a shot.”

The Financial Case

Trustees framed the $36,000 expense as a likely cost-saver based on the village’s current pump-to-bill ratio — the gap between water pumped from village wells and water actually billed to customers. That gap represents loss, much of it presumed to be from undetected underground leaks.

“If we find something major which I’m hoping that we do,” the superintendent said, “with our pump to build ratios we’re we’re hoping to find something you know catastrophic that we’re losing all this water um so it’ll pay for itself if we do just by the cost of what you know what we’re pumping versus what we’re billing.”

Trustees also pointed to avoided wear on water-system equipment. Gardner noted the village paid roughly $60,000 last year to replace a pump at Well 5 — a cost that mounts when undetected leaks force pumps to run harder and longer than necessary. Reducing pumping volume also cuts chemical treatment costs, another trustee added during discussion.

If results justify the expense, officials indicated the service may not need to be repeated annually. “Maybe every other year we talked about just to make sure,” the superintendent said.

The motion to accept the Asterra proposal passed by a unanimous roll-call vote of trustees Gardner, Roger Stacey, Brian Diachenko, Todd Kraus, Jessica Smith and Joe Tieri.

The Asterra contract was the second public works proposal approved during the meeting. The board also accepted a proposal from Baxter & Woodman for National Pollutant Discharge Elimination System Municipal Separate Storm Sewer System (MS4) program assistance for 2026 in an amount not to exceed $13,900. Gardner noted village staff may be able to reduce the final cost on the stormwater contract by handling portions of the work in-house.

Leave a Comment





Latest News Stories

Screenshot 2025-05-04 at 2.44.33 PM

County Finance Committee Advances Proposal for Elected Official Pay Raises After 20-Year Freeze

The Will County Finance Committee voted Thursday to advance a proposal that would provide the first salary increases for countywide elected officials and county board members in nearly two decades....
Screenshot 2025-05-04 at 2.50.36 PM

Will County Committee Debates Process for Taking Positions on State Legislation

Will County Legislative Committee members engaged in substantial discussion Thursday about how the committee should review and take positions on state legislation, with several members expressing concerns about the process...
Screenshot 2025-05-04 at 2.50.36 PM

State Lobbyists Update County on Springfield Action as Legislative Deadlines Approach

County officials received a comprehensive update on pending state legislation Thursday as lawmakers in Springfield approach critical deadlines for moving bills forward this session. Representatives from Mac Strategies, the county's...
Screenshot 2025-05-04 at 2.50.36 PM

Will County Legislative Committee News Briefs

Committee Postpones Action on Felony Conviction Voting Rights Bill: The Will County Legislative Committee declined to support House Bill 1288, which would allow individuals convicted of felonies to run for...
Screenshot 2025-05-04 at 2.44.33 PM

Shanahan Development Agreements Near Completion, Will County to See $282,000 Annual Revenue Boost

Will County will soon begin receiving the full tax benefit from industrial developments in Shanahan as the tax abatement and rebate agreements that helped fund infrastructure improvements approach their completion...
Screenshot 2025-05-04 at 2.44.33 PM

County Explores Bond Refinancing Options to Generate Potential Savings

Will County officials are exploring opportunities to refinance existing debt that could generate significant savings through two separate financial strategies, according to presentations to the Finance Committee on Thursday. Financial...
Screenshot 2025-05-04 at 2.44.33 PM

County Approves $150,000 for Medicare/Medicaid Billing Consultant for Health Department, Nursing Home

Will County will hire a consultant to review Medicare and Medicaid billing practices at both the county health department and Sunny Hill Nursing Home, aiming to maximize reimbursements and address...
Screenshot 2025-05-04 at 2.44.33 PM

County Receives First $50,000 Administrative Fee from Joliet Arsenal Enterprise Zone

Will County will collect its first $50,000 administrative fee from a business utilizing the Joliet Arsenal Enterprise Zone, after the Finance Committee approved appropriating the payment to the Land Use...
Screenshot 2025-05-04 at 2.44.33 PM

Will County Finance Committee News Briefs

County Property Tax Base Grows to $30.5 Billion: The county's net equalized assessed value (EAV) for the 2025 fiscal year reached $30.5 billion, finance officials reported during discussion of final...