NASA signs $590M in moon deals; total program cost unknown

NASA signs $590M in moon deals; total program cost unknown

Spread the love

NASA awarded $590.4 million in new Moon Base lander contracts Tuesday, but the agency has not disclosed what its broader Moon-to-Mars program will cost taxpayers.

It’s a question NASA has not answered for more than a month. Administrator Jared Isaacman gave no total cost estimate at a May 26 briefing despite direct questions from reporters. NASA has also not updated a $20 billion, seven-year cost estimate Isaacman gave in March for building the lunar base alone. That figure does not include the broader Moon-to-Mars program. NASA officials responded to a written question from The Center Square seeking that figure by a June 25 deadline, but didn’t provide an estimate. The total mission’s cost did not come up at Tuesday’s briefing.

A NASA spokesperson did not respond to a request for comment sent Tuesday on the total cost of its Moon-to-Mars program before publication.

NASA selected three commercial space companies Tuesday to deliver four new science payloads to the lunar surface in late 2028. Astrobotic received $297.9 million for two deliveries. Astrobotic is in the process of being acquired by Voyager Technologies in a deal pending regulatory approval and expected to close in July 2026. Firefly Aerospace received $144.2 million and Intuitive Machines received $148.3 million, each for one delivery, NASA officials said.

Each lander will carry three NASA instruments: a camera system that studies how a lander’s engine exhaust disturbs lunar dust, a reflector device used for navigation and a radiation monitor.

The unanswered question comes a week after NASA’s Office of Inspector General reported that contract values on four canceled or repurposed Artemis systems more than doubled, from $2.8 billion to $5.9 billion.

The Government Accountability Office has designated NASA acquisition management a high-risk area for more than 30 years.

The agency’s funding remains contested in Washington. The White House has proposed cutting NASA’s budget 23%, from $24.4 billion to $18.8 billion, while the House has advanced legislation keeping funding flat. U.S. Rep. Brian Babin, R-Texas, chairman of the House Science, Space and Technology Committee, has said the proposal could not support President Donald Trump’s own space exploration goals.

NASA and China are racing to land astronauts on the moon. Isaacman told lawmakers in April the competition could be decided “in months, not years,” and warned that China aims to reach the lunar surface before the end of the decade.

Carlos García-Galán, NASA’s Moon Base program manager, said Tuesday the agency is studying how landers’ engine plumes disturb lunar dust and could damage equipment already on the surface, with multiple landings planned in quick succession. Without intervention, landing sites would need to sit a mile and a half from other equipment, he said.

Isaacman said NASA is also weighing how the human body will hold up in the moon’s gravity, about one-sixth of Earth’s, after decades of research on the International Space Station in microgravity. The work matters for Mars, he said, where a crewed mission could take nine months one way.

“This is the next logical step on the journey,” Isaacman said, “where we should be very grateful we have a moon in such proximity to work with.”

García-Galán said NASA plans to scale its lunar payload capacity over time, from landers carrying 150 to 200 kilograms today to 500 kilograms, then two to three metric tons, and ultimately to Starship-class vehicles capable of carrying roughly 100 metric tons to the lunar surface. A 2024 inspector general audit found delivery costs had already risen to approximately $1.2 million per kilogram, a 20% increase from NASA’s original 2019 estimate.

NASA’s acting inspector general testified before Congress in January 2024 that the Artemis program alone was projected to exceed $93 billion through 2025. The agency has not said how much more the Moon-to-Mars program would add to that figure.

Leave a Comment





Latest News Stories

30 MPH Speed Limit

Will County Board Approves New 30 MPH Speed Limit for Frankfort Township Road

Will County Board Regular Meeting | October 16, 2025 Article Summary: The Will County Board approved a new 30 MPH speed limit for a section of 78th Avenue in Frankfort Township,...
Screenshot 2025-10-25 at 12.42.59 PM

Will County Committee Grapples with $8.9 Million Budget Gap After Contentious 0% Tax Levy Vote

Will County Board Finance Committee Meeting | October 21, 2025 Article Summary: The Will County Board Finance Committee held a contentious debate over how to close an $8.9 million budget shortfall...
Screenshot 2025-10-25 at 10.49.15 AM

Frankfort Township Board Objects, but County Commission Recommends Bar with Video Gaming

Will County Planning and Zoning Commission Meeting | October 21, 2025 Article Summary: Despite a formal objection from the Frankfort Township Board, the Will County Planning and Zoning Commission recommended...
Screenshot 2025-10-25 at 10.49.23 AM

Senior Shared Housing Facility Recommended for Approval in Crete Township

Will County Planning and Zoning Commission Meeting | October 21, 2025 Article Summary: The Will County Planning and Zoning Commission has recommended approval for a special use permit that would...
Screenshot 2025-10-25 at 10.49.32 AM

Crete Township ‘Tiny Home’ Owner Appeals Permit Denial

Will County Planning and Zoning Commission Meeting | October 21, 2025 Article Summary: A Crete Township property owner has appealed to the Will County Planning and Zoning Commission after being...
Will County Finance Logo

Will County Finance Committee Forwards 1.75% Compromise Property Tax Levy to Full Board

Will County Finance Committee Forwards 1.75% Compromise Property Tax Levy to Full Board Article Summary:The Will County Board’s Finance Committee on Tuesday, November 12, 2025, narrowly approved a series of...

WATCH: Trump calls Pritzker a ‘fat slob,’ Illinois governor blasts president

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – President Donald Trump has revived his criticism of Illinois Gov. J.B. Pritzker over crime, and Pritzker has...
Illinois business group warns of 'backbreaking' progressive income tax

Illinois business group warns of ‘backbreaking’ progressive income tax

By Greg Bishop | The Center SquareThe Center Square (The Center Square) – Manufacturers say legislators at the Illinois State Capitol have done enough damage and a progressive tax would...
Illinois tops U.S. in pumpkin production despite recent decline in value

Illinois tops U.S. in pumpkin production despite recent decline in value

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – Despite a recent decline in production value, Illinois is far and away the leader when it comes...
Congress moves to restore federal union powers, critics warn of higher costs

Congress moves to restore federal union powers, critics warn of higher costs

By Catrina Barker | The Center Square contributorThe Center Square (The Center Square) – The U.S. Congress is set to vote on House Resolution 2550, a bill that would restore...
Illinois quick hits: Chiropractor sentenced for fraud; fatal airport shooting investigation

Illinois quick hits: Chiropractor sentenced for fraud; fatal airport shooting investigation

By Jim Talamonti | The Center SquareThe Center Square Chiropractor sentenced for fraud A Chicago chiropractor has been sentenced to nearly six years in federal prison for billing a private...
Will County P&Z Logo Planning Zoning.2

Committee Grants Lenox Solar Farm Project Six-Month Variance Extension

Will County Planning and Zoning Commission Meeting | November 18, 2025 Article Summary:The Will County Planning and Zoning Commission has approved a 180-day extension for variances tied to a commercial...
Will County Logo Graphic

Speed Limits Lowered in Green Garden and Frankfort Neighborhoods

Will County Board Meeting | November 2025 Article Summary: The Will County Board adopted ordinances to establish new, lower speed limits in specific areas of Green Garden and Frankfort Townships....
Will County Board Graphic.02

Engineering Firm Hired for Gougar Road Bridge Replacement

Will County Board Meeting | November 2025 Article Summary: The Will County Board authorized a $301,000 contract for the design of a new bridge carrying Gougar Road over the Canadian...
Will County Board Graphic.03

Unpermitted Log Cabin and Stage Prompt Rezoning in Beecher

Will County Board Meeting | November 2025 Article Summary: The Will County Board approved a zoning map amendment and variances for a property in Beecher to bring existing unpermitted structures...