beecher ilinois school board graphic.1

Beecher High School Slated for Over $88,000 in Major Plumbing Repairs

Spread the love

Article Summary: The Beecher Board of Education unanimously approved two separate, significant plumbing projects for the high school totaling over $88,000 during its May 14 meeting. The board awarded both contracts to Action Plumbing to replace a failing water supply line and repair a staff bathroom drain.

Beecher Board of Education Key Points:

  • Approved a $43,000 contract with Action Plumbing to replace the main water supply line at Beecher High School.

  • Authorized a second contract with Action Plumbing for $45,100 to repair a staff bathroom drain at the high school.

  • The total cost for the two distinct projects is $88,100.

  • Both measures were approved unanimously by the board following discussions at a prior Facilities meeting.

BEECHER, IL – The Beecher Board of Education took decisive action on aging infrastructure at Beecher High School, approving two major plumbing repair projects with a combined cost of $88,100 at its meeting on Wednesday, May 14. Both contracts were awarded to Action Plumbing to address critical needs identified by the district.

The first project involves the complete replacement of the main water supply line at the high school, a significant undertaking priced at $43,000. Board member Amanda Hanson made the motion, which received a second from member Adriana Diachenko, leading to a unanimous 7-0 vote in favor.

The second, more costly project, addresses the repair of a staff bathroom drain at the high school for $45,100. Board member Brandy Flores motioned for its approval, with member Hanson providing the second. During the discussion, Superintendent Dr. Jack Gaham emphasized to the board that the two plumbing issues were “two distinct and different projects,” ensuring clarity on the scope and necessity of each repair. This item also passed with a unanimous 7-0 vote.

The approvals followed previous discussions at the district’s Facilities committee meeting, where the condition of the high school’s plumbing and the need for these specific repairs were vetted. The board’s swift and unanimous approval indicates a clear consensus on the urgency of the infrastructure work.

The projects represent a substantial investment in the maintenance and operational integrity of the high school campus. By addressing the failing supply line and the problematic drain, the board aims to prevent potential future disruptions, water damage, and more costly emergency repairs. Work on the projects is expected to be scheduled to minimize disruption to school activities.

All board members were present for the vote: President Ashley Belt, Vice President Ashley Fluechtling, Secretary Brandy Flores, and members Adriana Diachenko, Amanda Hanson, Dr. Marie Hansel, and Stacy Mazurek.

Leave a Comment





Latest News Stories

diamond shaped orange red reflector street sign that reads road

Laraway Road Widening Project in New Lenox and Frankfort Gets Additional $468,000 for Redesign

Article Summary: The Will County Board approved a supplemental agreement worth $468,374 for additional design and engineering work on the major Laraway Road expansion project. The funds are needed for...
solar panels photovoltaics in solar farm

“Federal Policy Uncertainty” Blamed for Delay of Peotone Solar Farm; County Grants Second Extension

Article Summary: The Will County Board has granted a second permit extension for a solar farm in Peotone Township after the developer, Trajectory Energy Partners, cited "ongoing uncertainty regarding federal...
solar panels photovoltaics in solar farm

Will County Grants Extensions to Five Solar Projects Sold to New Developers

Article Summary: The Will County Board approved first-time permit extensions for five commercial solar projects across Monee, Crete, and Joliet townships, all of which were recently sold to larger energy...
WCO 2025-09-27 at 9.04.10 AM

Will County Board Approves Controversial Drug Recovery Retreat in Crete Township

Article Summary: The Will County Board has approved a special use permit for The Second Story Foundation to operate a long-term residential recovery program for men on a 68-acre horse...
washington township graphic.3

Failed Repair Forces Replacement of 25-Year-Old Furnace at Washington Township Center

Article Summary: A failed repair attempt on the 25-year-old furnace at the Washington Township Center, which caused a fire alarm to activate, has prompted the board to authorize a full...
OLYMPUS DIGITAL CAMERA

Beecher Library Board Approves Budgets for Current and Upcoming Fiscal Years

Article Summary: The Beecher Public Library District Board of Trustees formally approved its final budget for the current 2024-2025 fiscal year and, following a public hearing, passed the new budget...
Meeting Briefs

Meeting Summary and Briefs: Beecher School District 200-U for September 10, 2025

The Beecher School District 200-U Board of Education approved its annual budget, appointed a new member, and greenlit a cosmetic upgrade for the high school during its meeting on September...
Meeting Briefs

Meeting Summary and Briefs: Village of Beecher Board of Trustees for September 22, 2025

The Beecher Village Board addressed persistent structural issues at the new Public Safety Facility during its meeting on September 22. After a report confirmed that new roof leaks have appeared...
washington township graphic.1

Washington Township Overhauls Wage Structure, Boosts Bus Driver Pay

Article Summary: The Washington Township Board of Trustees has initiated a comprehensive review of its wage and job structures to align with state law, improve competitiveness for key positions like...
beecher illinois public library graphic.1

Beecher Library Board President Shirley Biery Announces Resignation

Article Summary: Shirley Biery has announced she will resign from her position as President and Trustee of the Beecher Public Library District Board, effective August 31, 2025. Following the announcement...
Screenshot 2025-09-23 at 7.57.19 PM

Beecher Creates New Adjudication Clerk Position to Manage Municipal Court

Article Summary: The Village of Beecher has formally created the position of Adjudication Clerk by amending its municipal code, aiming to streamline the management of its local ordinance violation hearings....
Screenshot 2025-09-23 at 8.04.29 PM

Beecher High School to Get New Look with Approved Window Wrap

Article Summary: Beecher High School is set for an aesthetic upgrade after the Board of Education approved a nearly $12,500 proposal for a decorative and security-enhancing window wrap. After some...
Screenshot 2025-09-23 at 7.55.43 PM

State’s Attorney Donates Tint Meters to Beecher Police to Enhance Traffic Safety

Article Summary: The Beecher Police Department has received 14 new window tint meters through a donation from the Will County State's Attorney's Office. State's Attorney Jim Glasgow personally presented the...
Screenshot 2025-09-23 at 8.04.22 PM

Brad Shrader Appointed to Fill Vacant Beecher School Board Seat

Article Summary: The Beecher School District 200-U Board of Education has a full roster again after appointing resident Brad Shrader to fill a vacant seat at its September 10 meeting....
Screenshot 2025-09-23 at 8.04.16 PM

Beecher School Board Approves FY26 Budget With Projected Surplus, Earmarks Funds for Major Projects

Article Summary: The Beecher School District 200-U Board of Education formally adopted its Fiscal Year 2026 budget, projecting a modest surplus of approximately $96,000 and continuing a recent trend of...