Beecher Graphic.1

Beecher Approves Over $35,000 for Emergency Repairs to Well #5

Spread the love

Article Summary: The Beecher Village Board unanimously approved more than $35,000 in emergency repairs for Well #5 after a recent video inspection revealed significant corrosion, mineral buildup, and a failing check valve. The essential repairs are needed to address a corroding component that risks breaking and to treat deposits inside the well casing.

Beecher Public Works Key Points:

  • Approved $23,920 to Layne Christensen Company for well casing scarification, chlorination, and replacement of a corroded pitless spool.

  • Approved two proposals from Core & Main totaling $11,980.59 for a new check valve and a new 18-year-old master meter.

  • Repairs were deemed necessary after a video survey found a leaking discharge pipe, a corroding spool, and significant sulfate-based deposits and biofilm on the borehole walls.

BEECHER – The Village of Beecher will undertake a series of urgent repairs on a critical piece of its water infrastructure after the Board of Trustees approved three separate proposals totaling $35,900.59 to rehabilitate Well #5. The action came during the board’s June 9 meeting following a report from the Public Works Committee.

The need for the repairs was identified after a downhole video survey revealed several issues, including a buildup of iron and calcium deposits on the inside of the well pipe.

Trustee Erik Gardner presented the first proposal from Layne Christensen Company for $23,920. This work involves “scarification,” a process using a specialized tool to scrape the mineral deposits off the well’s interior walls. The well will then be chlorinated to prevent bacterial growth before being brought back online.

“There’s a buildup of iron and deposit calcium on the inside of the pipe that they want to take a basically a bit and run it down the inside of the pipe to scarify the walls,” Public Works Superintendent Matt Conner explained to the board.

The inspection also discovered that a “pitless spool,” a component welded into place, was suffering from significant corrosion. According to a proposal from Layne Christensen, the corrosion was advanced enough that it could lead to holes developing, potentially causing the “entire column pipe, pump and motor from falling down hole.”

“The corrosion attached to the weld where the weld actually weakens the metal,” Conner said. “So the corrosion actually started eating away at the weld that was done previously when the pipe was originally put in in 2007.”

In addition to the work by Layne Christensen, the board approved two proposals from Core & Main. The first, for $3,430, is to replace a check valve that is no longer functioning correctly. According to the agenda, the faulty valve is allowing water from the distribution system to leak back into the well house and down the shaft.

The second Core & Main proposal, for $8,550.59, will replace the well’s master meter. “The master meter is 18 years old and the public works committee made the recommendation to replace the meter while the well house is down,” Gardner read from the agenda.

All three measures were approved unanimously by Trustees Gardner, Roger Stacey, Brian Diachenko, Todd Kraus, Jessica Smith, and Joe Tieri.

Events

No events

Leave a Comment





Latest News Stories

Screenshot 2025-09-23 at 8.04.29 PM

Beecher High School to Get New Look with Approved Window Wrap

Article Summary: Beecher High School is set for an aesthetic upgrade after the Board of Education approved a nearly $12,500 proposal for a decorative and security-enhancing window wrap. After some...
Screenshot 2025-09-23 at 7.55.43 PM

State’s Attorney Donates Tint Meters to Beecher Police to Enhance Traffic Safety

Article Summary: The Beecher Police Department has received 14 new window tint meters through a donation from the Will County State's Attorney's Office. State's Attorney Jim Glasgow personally presented the...
Screenshot 2025-09-23 at 8.04.22 PM

Brad Shrader Appointed to Fill Vacant Beecher School Board Seat

Article Summary: The Beecher School District 200-U Board of Education has a full roster again after appointing resident Brad Shrader to fill a vacant seat at its September 10 meeting....
Screenshot 2025-09-23 at 8.04.16 PM

Beecher School Board Approves FY26 Budget With Projected Surplus, Earmarks Funds for Major Projects

Article Summary: The Beecher School District 200-U Board of Education formally adopted its Fiscal Year 2026 budget, projecting a modest surplus of approximately $96,000 and continuing a recent trend of...
Screenshot 2025-09-23 at 7.55.34 PM

Persistent Leaks at New Beecher Public Safety Facility Prompt Calls for Third-Party Inspection

Article Summary: Less than two months after multiple spot repairs were made, new leaks have appeared in the roof of Beecher's multimillion-dollar Public Safety Facility, reigniting concerns about the building's...
Illinois’ gun ban set for oral arguments in appeals court Monday

Illinois’ gun ban set for oral arguments in appeals court Monday

By Greg Bishop | The Center SquareThe Center Square (The Center Square) – The state of Illinois will be defending its gun and magazine ban Monday in front of the...
Law professor explains why Trump could win tariff case

Law professor explains why Trump could win tariff case

By Brett RowlandThe Center Square The U.S. Supreme Court could side with the Trump administration on a multi-billion dollar case over tariffs despite two lower courts saying the power of...
WATCH: Los Angeles schools superintendent renews contract

WATCH: Los Angeles schools superintendent renews contract

By Esther WickhamThe Center Square The Los Angeles Board of Education unanimously voted this week to renew its four-year contract with Los Angeles Unified School District Superintendent Alberto Carvalho, amid...
Southern California Edison works on paying Eaton Fire victims

Southern California Edison works on paying Eaton Fire victims

By Dave MasonThe Center Square Southern California Edison, which many blamed for starting the destructive Eaton Fire in the Pasadena/Altadena area, is developing a program to reimburse victims. The utility...
U.S. Sen. Mark Kelly presents 'AI for America' roadmap

U.S. Sen. Mark Kelly presents ‘AI for America’ roadmap

By Chris WoodwardThe Center Square Nearly two dozen public figures have come out in support of U.S. Sen. Mark Kelly’s artificial intelligence plan. Known as "AI for America," the plan...
WATCH: Education department launches America 250 effort

WATCH: Education department launches America 250 effort

By Esther WickhamThe Center Square The U.S. Department of Education, along with private organizations, launched this week the America 250 Civics Education Coalition, in an effort to revive civic education...
Trump: Chicago needs 'big, strong soldiers'

Trump: Chicago needs ‘big, strong soldiers’

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – President Donald Trump says Chicago needs big, strong soldiers to get the city into shape. The president...
WATCH: Gov. Gavin Newsom signs climate and energy bills

WATCH: Gov. Gavin Newsom signs climate and energy bills

By Dave MasonThe Center Square California Gov. Gavin Newsom Friday morning promised up to $60 billion in tax rebates on electricity fees just before signing climate and energy bills. The...
Large Wisconsin data center tax breaks make benefits unclear

Large Wisconsin data center tax breaks make benefits unclear

By Jon StyfThe Center Square When Microsoft announced plans for an additional $4 billion data center in Kenosha County on Thursday morning, it came with comments from Wisconsin Gov. Tony...
Panelists debate costs of energy legislation as Illinoisans struggle to pay bills

Panelists debate costs of energy legislation as Illinoisans struggle to pay bills

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – Some consumer advocates say battery storage legislation would help reduce energy price spikes, but others say an...