washington township graphic.2

Washington Township Board Stands Firm in Opposition to 2,400-Acre Earthrise Energy Solar Farm

Spread the love

Washington Township Board of Trustees Meeting | March 2, 2026

Article Summary: The Washington Township Board of Trustees strongly reiterated its opposition to a proposed 2,400-acre solar energy facility during its latest meeting, rejecting cash incentives and formally drafting a letter of opposition ahead of a county zoning hearing.

Washington Township Solar Farm Key Points:

  • Earthrise Energy is seeking a special use permit for a 2,400-acre solar facility spanning 44 parcels across Crete, Monee, Washington, and Will Townships.

  • The company is requesting zoning variances to reduce required mowings from five times a year to one, and to increase maximum ground cover height from 13 inches to 36 inches.

  • Highway Commissioner Mike Smith denied Earthrise’s request to take core samples of township roads, noting their provided map did not include Washington Township parcels.

  • Despite opposition, trustees debated whether the township is reaching a “tipping point” to negotiate road repair funding, as the state aggressively pushes clean energy programs.

On Monday, March 2, 2026, the Washington Township Board of Trustees doubled down on its resistance to a massive solar farm development slated for eastern Will County, directing Supervisor Mike Stanula to draft a formal letter of opposition against Earthrise Energy’s pending special use permit request.

Earthrise Energy has applied for a special use permit through Will County to construct a 2,400-acre solar energy facility. According to the agenda packet, the sprawling development would encompass 44 parcels located in Crete, Monee, Washington, and Will Townships. As part of the application, Earthrise is asking the county to significantly relax property maintenance standards, specifically requesting that the number of required mowings be reduced from five times a year to just once, and that the maximum ground cover height be increased from 13 inches to 36 inches.

A Will County hearing for the Special Use Permit is scheduled for March 18 in Joliet.

During the meeting, Highway Commissioner Mike Smith reported that an Earthrise Energy representative visited him the previous week, requesting permission to take core samples of township roads that would be affected by the solar facility’s construction. Smith denied the request, pointing out a geographic discrepancy in their planning documents.

“Smith said he denied the request because the map that was provided last week did not include any parcels located within the township,” the meeting minutes state.

Despite the denial, the Earthrise representative informed Smith that the company was willing to repair any roads damaged during construction. Smith informed the board that Earthrise has been offering cash incentives to local entities affected by the solar facilities, including direct funds to the Villages of Beecher and Crete, as well as the Beecher Fire District.

Historically, the Washington Township Board has stood against accepting any offered incentives, remaining universally opposed to the solar projects. However, board members acknowledged the reality that the projects are likely moving forward “regardless of township objections because the state is aggressively pushing for a clean energy program.”

This prompted a strategic question from Trustee Tracy Heldt, who asked the board if the township is at the “tipping point” where they should consider listening to what Earthrise wants to offer. Heldt suggested that if Earthrise is inevitably going to damage township roads but is willing to repair and improve them, it could result in a positive proposal and a savings to local taxpayers.

Commissioner Smith agreed that road repairs are highly expensive, noting that whatever improvements Earthrise could provide would save the road district substantial time and costs. Consequently, the Board directed Smith to contact the Earthrise representative and request more specific details regarding what the company is willing to offer toward road repairs.

Leave a Comment





Latest News Stories

Screenshot 2025-10-25 at 10.48.48 AM

New Lenox Solar Farm Proposal Advances with Conditions, Following Village and Forest Preserve Input

Will County Planning and Zoning Commission Meeting | October 21, 2025 Article Summary: The Will County Planning and Zoning Commission recommended approval for a 62.7-acre commercial solar energy facility in...
Meeting Briefs

Meeting Summary and Briefs: Will County Board for October 16, 2025

Will County Board Regular Meeting | October 16, 2025 The Will County Board took major action on property taxes at its meeting on Thursday, October 16, 2025, narrowly voting to...
30 MPH Speed Limit

Will County Board Approves New 30 MPH Speed Limit for Frankfort Township Road

Will County Board Regular Meeting | October 16, 2025 Article Summary: The Will County Board approved a new 30 MPH speed limit for a section of 78th Avenue in Frankfort Township,...
Screenshot 2025-10-25 at 12.42.59 PM

Will County Committee Grapples with $8.9 Million Budget Gap After Contentious 0% Tax Levy Vote

Will County Board Finance Committee Meeting | October 21, 2025 Article Summary: The Will County Board Finance Committee held a contentious debate over how to close an $8.9 million budget shortfall...
Screenshot 2025-10-25 at 10.49.15 AM

Frankfort Township Board Objects, but County Commission Recommends Bar with Video Gaming

Will County Planning and Zoning Commission Meeting | October 21, 2025 Article Summary: Despite a formal objection from the Frankfort Township Board, the Will County Planning and Zoning Commission recommended...
Screenshot 2025-10-25 at 10.49.23 AM

Senior Shared Housing Facility Recommended for Approval in Crete Township

Will County Planning and Zoning Commission Meeting | October 21, 2025 Article Summary: The Will County Planning and Zoning Commission has recommended approval for a special use permit that would...
Screenshot 2025-10-25 at 10.49.32 AM

Crete Township ‘Tiny Home’ Owner Appeals Permit Denial

Will County Planning and Zoning Commission Meeting | October 21, 2025 Article Summary: A Crete Township property owner has appealed to the Will County Planning and Zoning Commission after being...
Will County Finance Logo

Will County Finance Committee Forwards 1.75% Compromise Property Tax Levy to Full Board

Will County Finance Committee Forwards 1.75% Compromise Property Tax Levy to Full Board Article Summary:The Will County Board’s Finance Committee on Tuesday, November 12, 2025, narrowly approved a series of...

WATCH: Trump calls Pritzker a ‘fat slob,’ Illinois governor blasts president

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – President Donald Trump has revived his criticism of Illinois Gov. J.B. Pritzker over crime, and Pritzker has...
Illinois business group warns of 'backbreaking' progressive income tax

Illinois business group warns of ‘backbreaking’ progressive income tax

By Greg Bishop | The Center SquareThe Center Square (The Center Square) – Manufacturers say legislators at the Illinois State Capitol have done enough damage and a progressive tax would...
Illinois tops U.S. in pumpkin production despite recent decline in value

Illinois tops U.S. in pumpkin production despite recent decline in value

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – Despite a recent decline in production value, Illinois is far and away the leader when it comes...
Congress moves to restore federal union powers, critics warn of higher costs

Congress moves to restore federal union powers, critics warn of higher costs

By Catrina Barker | The Center Square contributorThe Center Square (The Center Square) – The U.S. Congress is set to vote on House Resolution 2550, a bill that would restore...
Illinois quick hits: Chiropractor sentenced for fraud; fatal airport shooting investigation

Illinois quick hits: Chiropractor sentenced for fraud; fatal airport shooting investigation

By Jim Talamonti | The Center SquareThe Center Square Chiropractor sentenced for fraud A Chicago chiropractor has been sentenced to nearly six years in federal prison for billing a private...
Will County P&Z Logo Planning Zoning.2

Committee Grants Lenox Solar Farm Project Six-Month Variance Extension

Will County Planning and Zoning Commission Meeting | November 18, 2025 Article Summary:The Will County Planning and Zoning Commission has approved a 180-day extension for variances tied to a commercial...
Will County Logo Graphic

Speed Limits Lowered in Green Garden and Frankfort Neighborhoods

Will County Board Meeting | November 2025 Article Summary: The Will County Board adopted ordinances to establish new, lower speed limits in specific areas of Green Garden and Frankfort Townships....