washington township graphic.2

Washington Township Board Stands Firm in Opposition to 2,400-Acre Earthrise Energy Solar Farm

Spread the love

Washington Township Board of Trustees Meeting | March 2, 2026

Article Summary: The Washington Township Board of Trustees strongly reiterated its opposition to a proposed 2,400-acre solar energy facility during its latest meeting, rejecting cash incentives and formally drafting a letter of opposition ahead of a county zoning hearing.

Washington Township Solar Farm Key Points:

  • Earthrise Energy is seeking a special use permit for a 2,400-acre solar facility spanning 44 parcels across Crete, Monee, Washington, and Will Townships.

  • The company is requesting zoning variances to reduce required mowings from five times a year to one, and to increase maximum ground cover height from 13 inches to 36 inches.

  • Highway Commissioner Mike Smith denied Earthrise’s request to take core samples of township roads, noting their provided map did not include Washington Township parcels.

  • Despite opposition, trustees debated whether the township is reaching a “tipping point” to negotiate road repair funding, as the state aggressively pushes clean energy programs.

On Monday, March 2, 2026, the Washington Township Board of Trustees doubled down on its resistance to a massive solar farm development slated for eastern Will County, directing Supervisor Mike Stanula to draft a formal letter of opposition against Earthrise Energy’s pending special use permit request.

Earthrise Energy has applied for a special use permit through Will County to construct a 2,400-acre solar energy facility. According to the agenda packet, the sprawling development would encompass 44 parcels located in Crete, Monee, Washington, and Will Townships. As part of the application, Earthrise is asking the county to significantly relax property maintenance standards, specifically requesting that the number of required mowings be reduced from five times a year to just once, and that the maximum ground cover height be increased from 13 inches to 36 inches.

A Will County hearing for the Special Use Permit is scheduled for March 18 in Joliet.

During the meeting, Highway Commissioner Mike Smith reported that an Earthrise Energy representative visited him the previous week, requesting permission to take core samples of township roads that would be affected by the solar facility’s construction. Smith denied the request, pointing out a geographic discrepancy in their planning documents.

“Smith said he denied the request because the map that was provided last week did not include any parcels located within the township,” the meeting minutes state.

Despite the denial, the Earthrise representative informed Smith that the company was willing to repair any roads damaged during construction. Smith informed the board that Earthrise has been offering cash incentives to local entities affected by the solar facilities, including direct funds to the Villages of Beecher and Crete, as well as the Beecher Fire District.

Historically, the Washington Township Board has stood against accepting any offered incentives, remaining universally opposed to the solar projects. However, board members acknowledged the reality that the projects are likely moving forward “regardless of township objections because the state is aggressively pushing for a clean energy program.”

This prompted a strategic question from Trustee Tracy Heldt, who asked the board if the township is at the “tipping point” where they should consider listening to what Earthrise wants to offer. Heldt suggested that if Earthrise is inevitably going to damage township roads but is willing to repair and improve them, it could result in a positive proposal and a savings to local taxpayers.

Commissioner Smith agreed that road repairs are highly expensive, noting that whatever improvements Earthrise could provide would save the road district substantial time and costs. Consequently, the Board directed Smith to contact the Earthrise representative and request more specific details regarding what the company is willing to offer toward road repairs.

Leave a Comment





Latest News Stories

Will County Board Graphic.02

Engineering Firm Hired for Gougar Road Bridge Replacement

Will County Board Meeting | November 2025 Article Summary: The Will County Board authorized a $301,000 contract for the design of a new bridge carrying Gougar Road over the Canadian...
Will County Board Graphic.03

Unpermitted Log Cabin and Stage Prompt Rezoning in Beecher

Will County Board Meeting | November 2025 Article Summary: The Will County Board approved a zoning map amendment and variances for a property in Beecher to bring existing unpermitted structures...
Federal court blocks Trump from dismantling four agencies

Federal court blocks Trump from dismantling four agencies

By Dave Mason | The Center SquareThe Center Square (The Center Square) – A federal court has issued a permanent injunction stopping the Trump administration from dismantling four federal agencies...
State reps: Pritzker turns 'blind eye' to Chicago’s public safety crisis

State reps: Pritzker turns ‘blind eye’ to Chicago’s public safety crisis

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – After Gov. J.B. Pritzker said President Donald Trump was amplifying crime in Chicago, Illinois House Republicans said...
Illinois quick hits: Medicaid coverage for parental home visits; 'Trouble in Toyland' report

Illinois quick hits: Medicaid coverage for parental home visits; ‘Trouble in Toyland’ report

By Jim Talamonti | The Center SquareThe Center Square Medicaid coverage for parental home visits The Illinois Department of Healthcare and Family Services has launched new Medicaid coverage of home...
Potential data center in Illinois village raises local concerns

Potential data center in Illinois village raises local concerns

By Catrina Barker | The Center Square contributorThe Center Square (The Center Square) – Residents voice concerns about heavy power use, water demands and the impact of a potential data...
solar panels photovoltaics in solar farm

New Lenox to Host Large Pollinator-Friendly Solar Farm

Will County Board Meeting | November 2025 Article Summary: The Will County Board unanimously approved a special use permit for a commercial solar energy facility spanning approximately 63 acres in...
joliet junior college logo

JJC Receives Clean Audit, Reports $21.6 Million Increase in Net Position

Joliet Junior College Meeting | November 12, 2025 Article Summary:Joliet Junior College received a "clean unmodified audit opinion" for the fiscal year ending June 30, 2025, the highest level of...
Poll: Majority of Americans still support legal immigration

Poll: Majority of Americans still support legal immigration

By Andrew RiceThe Center Square A majority of Americans say that legal immigration is good for the United States, according to a new poll commissioned by The Center Square. The...
New Illinois youth center begins housing youth in Lincoln

New Illinois youth center begins housing youth in Lincoln

By Catrina Barker | The Center Square contributorThe Center Square (The Center Square) - After a short delay to finalize staffing and safety preparations, the new Monarch Center in Lincoln...
State officials urge Trump, Congress to address national debt

State officials urge Trump, Congress to address national debt

By Brett RowlandThe Center Square Indiana Gov. Mike Braun and a coalition of state financial officers and lawmakers are urging Congress and President Donald Trump to address the national debt...
will county board graphic

Will County Board Passes 0% Tax Levy, Creating “Unbalanced” Budget Crisis

Will County Board Meeting | November 2025 Article Summary: In a contentious fiscal showdown, the Will County Board voted to keep the corporate property tax levy flat, rejecting a proposed...
Will County P&Z Logo Planning Zoning

Committee Advances Special Use Permit for Used Car Dealership in New Lenox Township

Will County Planning and Zoning Commission Meeting | November 18, 2025 Article Summary:The Will County Planning and Zoning Commission has approved a special use permit for a light equipment sales...
War Department, VA have highest number of unresolved audit recommendations

War Department, VA have highest number of unresolved audit recommendations

By Morgan SweeneyThe Center Square Of the 15 federal executive departments that compose the president’s Cabinet, the Departments of War and Veterans Affairs have the most unresolved, open recommendations for...
Nearly 550 truck drivers cited for not understanding English in Illinois YTD

Nearly 550 truck drivers cited for not understanding English in Illinois YTD

By Greg Bishop | The Center SquareThe Center Square (The Center Square) – The number of English language proficiency violations for commercial drivers in Illinois year-to-date has nearly eclipsed last...