Beecher Village Graphic.2

Beecher Approves $36,000 Satellite Leak Detection Contract With Asterra

Spread the love

Beecher Village Board Meeting | May 11, 2026

Article Summary: The Beecher Village Board on Monday, May 11, 2026, unanimously approved a $36,000 contract with Asterra to provide satellite-based leak detection services, a new technology the village hopes will identify subsurface water main leaks before they surface and drive up pumping costs.

Asterra Leak Detection Key Points:

  • The board accepted a $36,000 proposal from Asterra for satellite leak detection, well below the $72,000 to $108,000 range trustees had been bracing for.
  • Service includes a five-person crew working on-site for a week to narrow satellite findings to within an 18-foot radius.
  • Public works officials hope the system will identify “catastrophic” subsurface losses currently driving up pump-to-bill ratios.
  • The board indicated the service could become a biennial rather than annual expense if results are strong.

BEECHER — The Beecher Village Board on Monday, May 11, 2026, unanimously approved a $36,000 contract with Asterra to provide satellite-based leak detection services, a tool village officials hope will dramatically reduce unaccounted-for water loss by pinpointing leaks below ground that don’t surface in visible breaks.

Trustee Erik Gardner, who chairs the Public Works Committee, introduced the motion after telling colleagues that the price came in well under expectations. “It’s uh very promising and it was we were kind of figuring that was it could be maybe two to three times more expensive than this,” Gardner said. “So it was it was pretty surprising but um pretty promising.”

The technology differs from traditional surface-leak surveys. According to the public works superintendent, who briefed the board, the Asterra satellite scan is calibrated to detect chlorinated municipal water specifically, distinguishing treated drinking water from naturally occurring sources such as rivers, streams or saltwater. The result is a system tuned to find leaks from the village’s distribution mains rather than chase false positives from surface water.

How the Service Works

Once satellite data is analyzed, Asterra deploys a five-person crew to Beecher for roughly a week. That crew uses the satellite findings to narrow each suspected leak to within an 18-foot radius, the superintendent told the board, giving village staff a tight target area for follow-up excavation. “They’ll have a fiveman crew on site as well for a week and trying to pinpoint within an 18t radius of what the satellite’s telling them,” he said. “So, kind of get us at least in a general direction of where some of the bigger leaks are below grade.”

The superintendent acknowledged the technology is unproven for Beecher’s distribution system. “It’s uh pretty sounded pretty promising,” he said. “Um it’s definitely a a new technology era that we’re, you know, trying to give it a shot.”

The Financial Case

Trustees framed the $36,000 expense as a likely cost-saver based on the village’s current pump-to-bill ratio — the gap between water pumped from village wells and water actually billed to customers. That gap represents loss, much of it presumed to be from undetected underground leaks.

“If we find something major which I’m hoping that we do,” the superintendent said, “with our pump to build ratios we’re we’re hoping to find something you know catastrophic that we’re losing all this water um so it’ll pay for itself if we do just by the cost of what you know what we’re pumping versus what we’re billing.”

Trustees also pointed to avoided wear on water-system equipment. Gardner noted the village paid roughly $60,000 last year to replace a pump at Well 5 — a cost that mounts when undetected leaks force pumps to run harder and longer than necessary. Reducing pumping volume also cuts chemical treatment costs, another trustee added during discussion.

If results justify the expense, officials indicated the service may not need to be repeated annually. “Maybe every other year we talked about just to make sure,” the superintendent said.

The motion to accept the Asterra proposal passed by a unanimous roll-call vote of trustees Gardner, Roger Stacey, Brian Diachenko, Todd Kraus, Jessica Smith and Joe Tieri.

The Asterra contract was the second public works proposal approved during the meeting. The board also accepted a proposal from Baxter & Woodman for National Pollutant Discharge Elimination System Municipal Separate Storm Sewer System (MS4) program assistance for 2026 in an amount not to exceed $13,900. Gardner noted village staff may be able to reduce the final cost on the stormwater contract by handling portions of the work in-house.

Leave a Comment





Latest News Stories

Beecher Elementary school Graphic

School Facilities Committee Reviews Elementary School Window and Roof Repairs

Beecher School District Facilities Committee Meeting | December 2025 Article Summary: The Beecher School District 200-U Facilities Committee reviewed competing assessments for water intrusion at Beecher Elementary, favoring a comprehensive...
Illinois quick hits: Another attack on CTA passenger; plaintiffs move to dismiss their ICE use of force case

Illinois quick hits: Another attack on CTA passenger; plaintiffs move to dismiss their ICE use of force case

By Jim Talamonti | The Center SquareThe Center Square Another attack on CTA passenger Illinois House Republicans say the SAFE-T Act continues to fail Illinois residents after a suspect with...

WATCH: Pritzker: ‘No’ to state taxpayer-funded guaranteed income

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – Gov. J.B. Pritzker says he is not planning to follow Cook County by implementing a guaranteed income...

WATCH: IL congresswoman willing to withhold highway dollars over CDL issues

By Greg Bishop | The Center SquareThe Center Square (The Center Square) – A Republican congresswoman from Illinois is looking to enforce federal Commercial Drivers License requirements by withholding federal...
Disability group, coroners press governor ahead of assisted suicide decision

Disability group, coroners press governor ahead of assisted suicide decision

By Catrina Barker | The Center Square contributorThe Center Square (The Center Square) – A Chicago-based disability-rights organization is seeking a meeting with Gov. J.B. Pritzker’s office as Illinois prepares...
Meeting-Briefs

Meeting Summary and Briefs: Village of Beecher for November 24, 2025

Village of Beecher Meeting | November 24, 2025 The Beecher Village Board met on Monday, November 24, 2025, to address routine financial business and discuss seasonal community issues. While much...
WATCH: U.S. Rep. Miller live; Heated rhetoric in Congress; SNAP, ‘basic income’ debate

WATCH: U.S. Rep. Miller live; Heated rhetoric in Congress; SNAP, ‘basic income’ debate

By Greg Bishop | The Center SquareThe Center Square (The Center Square) – In today's edition of Illinois in Focus Daily, The Center Square Editor Greg Bishop talks live with...
beecher ilinois school board graphic.5

Solution Found to Revive Broken Junior High Digital Sign

Beecher School Board Facilities Committee Meeting | November 24, 2025 Article Summary: The Facilities Committee received a report detailing a cost-effective solution to retrofit the non-functional digital sign at Beecher...
Beecher Graphic.1

Beecher Sets Schedule for Parade of Lights and Holiday Contests

Village of Beecher Meeting | November 24, 2025 Article Summary: The Beecher Village Board finalized the schedule for the upcoming Parade of Lights and the Holiday Lights Decorating Contest. Holiday...
beecher ilinois school board graphic.3

“Cheaper to Go Up”: Beecher Schools Discuss Vertical Expansion Concepts

Beecher School Board Facilities Committee Meeting | November 24, 2025 Article Summary: Facing potential future enrollment growth and high land costs, the Beecher School Board Facilities Committee discussed conceptual plans...
Beecher Graphic.2

Weather Delays Force Extension of Leaf Collection in Beecher

Village of Beecher Meeting | November 24, 2025 Article Summary: The Village of Beecher is extending its annual leaf collection program through mid-December due to recent snow and rain delays....
Weather-Winter

Beecher Digs Out from 12.4 Inches of Snow; Sub-Zero Cold Forecast for Friday

Article Summary: Beecher residents are clearing more than a foot of snow following a major weekend storm, while forecasters warn of a dangerous drop in temperatures and additional snowfall arriving...
Illinois rejects federal ‘no tax on tips’ rule, keeps state tax on tipped income

Illinois rejects federal ‘no tax on tips’ rule, keeps state tax on tipped income

By Catrina Barker | The Center Square contributorThe Center Square (The Center Square) – Illinois is not adopting the new federal “no tax on tips” provision, meaning tipped workers in...
Beecher Elementary school Graphic

Contractors Clash on Cause of Elementary School Leaks; Committee Weighs Window Replacement

Beecher School Board Facilities Committee Meeting | November 24, 2025 Article Summary: The Beecher School District 200-U Facilities Committee reviewed proposals for replacing windows at the Elementary School but paused...
Will County Board Graphic.01

Frankfort Turns to County for Wildlife & Dangerous Animal Control

Will County Board Meeting | November 2025 Article Summary: The Village of Frankfort has entered into a two-year agreement with Will County Animal Protection Services to handle calls regarding bats...