Beecher Village Graphic.2

Beecher Approves $36,000 Satellite Leak Detection Contract With Asterra

Spread the love

Beecher Village Board Meeting | May 11, 2026

Article Summary: The Beecher Village Board on Monday, May 11, 2026, unanimously approved a $36,000 contract with Asterra to provide satellite-based leak detection services, a new technology the village hopes will identify subsurface water main leaks before they surface and drive up pumping costs.

Asterra Leak Detection Key Points:

  • The board accepted a $36,000 proposal from Asterra for satellite leak detection, well below the $72,000 to $108,000 range trustees had been bracing for.
  • Service includes a five-person crew working on-site for a week to narrow satellite findings to within an 18-foot radius.
  • Public works officials hope the system will identify “catastrophic” subsurface losses currently driving up pump-to-bill ratios.
  • The board indicated the service could become a biennial rather than annual expense if results are strong.

BEECHER — The Beecher Village Board on Monday, May 11, 2026, unanimously approved a $36,000 contract with Asterra to provide satellite-based leak detection services, a tool village officials hope will dramatically reduce unaccounted-for water loss by pinpointing leaks below ground that don’t surface in visible breaks.

Trustee Erik Gardner, who chairs the Public Works Committee, introduced the motion after telling colleagues that the price came in well under expectations. “It’s uh very promising and it was we were kind of figuring that was it could be maybe two to three times more expensive than this,” Gardner said. “So it was it was pretty surprising but um pretty promising.”

The technology differs from traditional surface-leak surveys. According to the public works superintendent, who briefed the board, the Asterra satellite scan is calibrated to detect chlorinated municipal water specifically, distinguishing treated drinking water from naturally occurring sources such as rivers, streams or saltwater. The result is a system tuned to find leaks from the village’s distribution mains rather than chase false positives from surface water.

How the Service Works

Once satellite data is analyzed, Asterra deploys a five-person crew to Beecher for roughly a week. That crew uses the satellite findings to narrow each suspected leak to within an 18-foot radius, the superintendent told the board, giving village staff a tight target area for follow-up excavation. “They’ll have a fiveman crew on site as well for a week and trying to pinpoint within an 18t radius of what the satellite’s telling them,” he said. “So, kind of get us at least in a general direction of where some of the bigger leaks are below grade.”

The superintendent acknowledged the technology is unproven for Beecher’s distribution system. “It’s uh pretty sounded pretty promising,” he said. “Um it’s definitely a a new technology era that we’re, you know, trying to give it a shot.”

The Financial Case

Trustees framed the $36,000 expense as a likely cost-saver based on the village’s current pump-to-bill ratio — the gap between water pumped from village wells and water actually billed to customers. That gap represents loss, much of it presumed to be from undetected underground leaks.

“If we find something major which I’m hoping that we do,” the superintendent said, “with our pump to build ratios we’re we’re hoping to find something you know catastrophic that we’re losing all this water um so it’ll pay for itself if we do just by the cost of what you know what we’re pumping versus what we’re billing.”

Trustees also pointed to avoided wear on water-system equipment. Gardner noted the village paid roughly $60,000 last year to replace a pump at Well 5 — a cost that mounts when undetected leaks force pumps to run harder and longer than necessary. Reducing pumping volume also cuts chemical treatment costs, another trustee added during discussion.

If results justify the expense, officials indicated the service may not need to be repeated annually. “Maybe every other year we talked about just to make sure,” the superintendent said.

The motion to accept the Asterra proposal passed by a unanimous roll-call vote of trustees Gardner, Roger Stacey, Brian Diachenko, Todd Kraus, Jessica Smith and Joe Tieri.

The Asterra contract was the second public works proposal approved during the meeting. The board also accepted a proposal from Baxter & Woodman for National Pollutant Discharge Elimination System Municipal Separate Storm Sewer System (MS4) program assistance for 2026 in an amount not to exceed $13,900. Gardner noted village staff may be able to reduce the final cost on the stormwater contract by handling portions of the work in-house.

Leave a Comment





Latest News Stories

WCO Exec Cmte July 10.1

County Approves School Resource Officer, Multi-Year Planning Requirements

Will County approved hiring an additional sheriff's deputy for a school resource officer position that will be fully funded by Summit Hill School District 161, while also passing new transparency...
WCO Exec Cmte July 10.2

County Addresses Senior Tax Exemption Processing Error

A processing error that cost County Board member Julie Berkowicz $600 in senior tax exemptions has prompted discussions about improving verification systems for property tax breaks. Will County Chief Assessment...
Meeting Briefs

Executive Committee Meeting July 10 Meeting Briefs

Liquor License Expansion: The county approved increasing Class C1 liquor licenses from eight to nine to accommodate Lockport Gas and Food LLC at 14747 W. 159th Street in Homer Glen....
Screenshot 2025-08-22 at 8.12.43 PM

Beecher School Board Begins Overhaul of District Goals, Focusing on Transparency, Inclusivity, and Student Success

Article Summary: The Beecher Board of Education has initiated a comprehensive update of its district-wide goals, beginning a process to replace a strategic plan that has been in place since...
beecher ilinois school board graphic.12

Beecher School Board Finalizes Policy Updates, Approves New Student Handbook

Article Summary: The Beecher Board of Education gave its final approval to a series of policy updates and a revised Student Handbook for the 2025-2026 school year. The unanimous votes...
beecher ilinois school board graphic.5

District Modifies Janitorial Contract, Saving Money by Bringing Junior High In-House

Article Summary: The Beecher Board of Education approved a new janitorial contract with Citywide Janitorial for the 2025-2026 fiscal year that covers only the elementary school, a change that will...
Meeting Briefs

Meeting Summary and Briefs: Beecher Board of Education for July 9, 2025

The Beecher Board of Education began the process of creating a new five-year strategic plan by holding an in-depth discussion to overhaul its district goals at its July 9 meeting....
washington township graphic.1

Washington Township to Reduce Office Hours in Summer Trial

Article Summary: The Washington Township Board of Trustees has approved a plan to reduce public office hours for a trial period this summer, citing less foot traffic and potential cost...
washington township graphic.2

Washington Township Opts for $1,050 AC Repair Over $10,200 Replacement

Article Summary: The Washington Township Board of Trustees chose to repair two non-functional, 25-year-old air conditioning units for $1,050 rather than pursue a full replacement of all three units at...
washington township graphic.3

Property Assessments Set to Rise Across Washington Township

Article Summary: Washington Township Assessor Pat Peters has advised residents that property assessments are expected to rise for nearly every property in the township. The increase is due to a...
Meeting-Briefs

Meeting Summary and Briefs: Washington Township Board of Trustees for July 7, 2025

The Washington Township Board of Trustees voted to reduce its public office hours for the summer, a key decision made during its meeting on Monday, July 7. Citing a decline...
Will County Land Use July 3.1

Committee Rejects Troy Township Solar Projects Amid Strong Local Opposition

The Will County Land Use and Development Committee recommended denial for two controversial commercial solar energy projects in Troy Township on Thursday, following a wave of opposition from local municipalities,...
Will County Land Use July3.2

Controversial DuPage Township Rezoning for Outdoor Storage Advances

A contentious proposal to rezone a 20-acre parcel in DuPage Township from agricultural (A-1) to heavy industrial (I-3) for an outdoor vehicle storage facility narrowly passed the Will County Land...
Will County Land Use July3.2

Residents Allege Health Crises, Violations from Peotone Grain Facility

Two residents of unincorporated Peotone delivered emotional testimony to the Will County Land Use and Development Committee Thursday, alleging that a neighboring grain facility is causing severe health problems and...
Will County Public Health & Safety Committee Meeting July 3, 2025

Health Department May Seek Property Tax Increase to Maintain Critical Services

The Will County Health Department is grappling with significant budget shortfalls as multiple federal grants have been terminated or reduced, potentially forcing the agency to seek additional property tax revenue...